RAF Merlins Begin Operating in Afghanistan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Dec 02, 2009

RAF Merlins Begin Operating in Afghanistan

Helos Now Available For Front Line Operations After Quick Turnaround

Just two weeks after arriving in Afghanistan, the initial RAF Merlin Force has now passed the extensive pre-flight checks enabling them to take to the Afghan skies one month ahead of schedule. This declaration of an Initial Operating Capability means that following transportation to Afghanistan, re-assembly and pre-flight checks, Merlins are now available for operational flying on the front line.

The Merlins are transporting troops to and from the Forward Operating Bases and are resupplying them with ammunition, food and equipment.

The full Merlin deployment to Afghanistan will be completed by the end of this year, providing a significant increase in UK military helicopters. Merlins can carry up to 20 personnel and will provide an additional capability to the Chinook, Sea King and Lynx.

"This is a tremendous achievement by the Merlin Helicopter Force," said Commander Joint Helicopter Command, Rear Admiral Tony Johnstone-Burt. "Having left Iraq in the summer, they have retrained the aircrew and reconfigured the aircraft for Afghanistan in double-quick time. This marks a tangible enhancement of helicopter capability in theater, and is a major step forward in supporting our troops. The whole Joint Helicopter Force's morale is very high; the first Merlins are now operating on the front line, and more will follow."

"The delivery of Merlin in Afghanistan almost a month ahead of schedule is testament to the outstanding efforts and teamwork of the Merlin Force and RAF Benson," said Group Captain Jonathan Burr, Station Commander at RAF Benson, where the Merlin Force is based. "We have pulled out all the stops to get the aircraft into Afghanistan as soon as possible and are now ready to provide significant helicopter lift to the troops in Helmand."

"I am really pleased that the Merlin helicopters are now up and running in Afghanistan and have been given the green light for operations," added Defence Secretary Bob Ainsworth. "The delivery of this capability is one month ahead of schedule and it is an outstanding effort, achieved through the ongoing determination and sheer hard work applied by all those involved."

FMI: www.mod.uk

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, Nat’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

Klyde Morris (06.30.25)

What Goes Around, May Yet Come Back Around, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC