NASA Exercises Contract Option For White Sands Test Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Apr 27, 2015

NASA Exercises Contract Option For White Sands Test Facility

Tennessee Company To Continue To Provide Test Evaluation And Support Services

NASA is exercising its second cost-plus-award-fee option to extend the period of performance with Jacobs Technology Inc. of Tullahoma, Tennessee, to provide test evaluation and support services at the agency's White Sands Test Facility in Las Cruces, New Mexico.

The Test Evaluation and Support Team (TEST), an award fee, indefinite-delivery, indefinite-quantity contract, includes a three-year base period with a potential maximum value of $300 million, and two one-year options, each with a potential maximum value of $100 million, bringing the total potential contract value to $500 million.

Examples of the type of work that Jacobs Technology will provide under the second one-year option, which begins May 1, include propulsion systems testing; propellants and aerospace fluids materials and components testing; remote hazardous testing; quality assurance; test and institutional safety and health; hypervelocity impact testing; flight hardware processing; technical services; training; facility maintenance; and communication systems and construction management.

Subcontractors include ERC Inc. of Huntsville, Alabama, and GeoControl Systems Inc. and MEI Technologies Inc., both of Houston.

FMI: www.nasa.gov/centers/wstf/

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, Nat’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

Klyde Morris (06.30.25)

What Goes Around, May Yet Come Back Around, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC