FAA Invites Public Comment For Draft Environmental Review For SpaceX Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Sep 21, 2021

FAA Invites Public Comment For Draft Environmental Review For SpaceX Program

Public Hearing To Take Place October 6 and 7  

The FAA invites the public to provide its input on the draft environmental review for the proposed SpaceX Starship/Super Heavy program in Boca Chica, Texas. 

The Draft Programmatic Environmental Assessment investigates the potential environmental impacts of SpaceX’s initial mission profile for the program, including launch and reentry. It also reviews debris recovery, the integration tower and other launch-related construction, and local road closures in Boca Chica, among other issues. 

A public hearing is planned virtually for October 6 and 7 as part of a 30-day public comment period that will conclude on October 18.

The SpaceX launch can not take place until the FAA finalizes its licensing, which includes the environmental review.  

The Starship/Super Heavy operations fall outside of the scope of the existing 2014 Final Environmental Impact Statement and Record of Decision for the Boca Chica launch site, thus requiring this additional environmental review under the National Environmental Policy Act. 

If the Draft PEA is finalized, and SpaceX further develops the program, the FAA would analyze the environmental impacts of proposed future activities in part by using information developed during the current process.

Following the public comments and review, if the FAA determines the impacts of the project would be significant, then a more intensive EIS would be conducted.

Several federal and state agencies are involved in the Draft PEA as cooperating and participating agencies, including: National Aeronautics and Space Administration, National Park Service, U.S. Coast Guard, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, Texas Parks and Wildlife Department, Texas Historical Commission, Texas Government Land Office and Texas Department of Transportation.


FMI: https://www.spacex.com, https://www.faa.gov

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, Nat’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

Klyde Morris (06.30.25)

What Goes Around, May Yet Come Back Around, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC