Test Flight Completed After F-35B Modifications | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Wed, Jul 01, 2015

Test Flight Completed After F-35B Modifications

Air Force Sustainment Center Commander Calls Flight 'Eye-Watering'

The Ogden Air Logistics Complex completed an F-35B Lightning II functional check flight at Utah's Hill AFB  June 18, after the first depot-level short take off and vertical landing modifications were completed on two F-35Bs for the Marine Corps.

Lt. Col. Kevin Hall, a member of the 514th Flight Test Squadron and the first depot test pilot in the Air Force qualified in the F-35B, took off from Hill Air Force Base and zoomed to altitude before heading to the Utah Test and Training Range for a functional check.
 
As he returned to base, Hall converted the versatile aircraft for short takeoff vertical landing operations and performed a "short" landing and a "rolling" takeoff.
 
Witnessing the successful flight was "eye-watering," said Lt. Gen. Lee Levy II, the commander of the Air Force Sustainment Center.
 
The Marine Corps sent two F-35Bs to the Ogden Air Logistics Complex on Feb. 2, 2015, for depot-level modifications. The jets came to Hill AFB from the Marine Corps with less than a week's notice.
 
In just over four months, workers completed the modifications necessary for the F-35B's initial operational capability, putting in 24,000 hours to get the job done.
 
"The work accomplished by the men and women of the 570th Aircraft Maintenance Squadron has been nothing short of amazing," said Brig. Gen. Carl Buhler, the Ogden Air Logistics Complex commander.

Completing the modifications on time required the maintainers to overcome numerous challenges, Buhler said. They removed sections of the aircraft that many thought would never be removed, and they strengthened wing ribs and worked in areas that required rare "micro tolerances."

"In the process, the maintainers developed techniques that will be used as benchmarks in a variety of depot operations in the future," Buhler said. "The accomplishments of the members of the squadron -- in concert with our Lockheed Martin teammates, with the support of the 75th Air Base Wing -- have been remarkable."
 
The second F-35B is scheduled to be completed in the coming days.
 
"I couldn't be prouder of you and the support we're providing to our joint partners,” Levy said in a message to the workforce. “The Marines were counting on us, and you delivered."

(USAF Image)

FMI: www.af.mil

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC