New LAX Runway Showing Construction Flaws | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Oct 21, 2013

New LAX Runway Showing Construction Flaws

Cracks In The Pavement, Other Premature Wear Leads To Lawsuits Against Contractors

A 13,000-foot runway at Los Angeles International Airport (KLAX) which opened in April 2007 is already showing signs of wear, and the city has filed a $250 million lawsuit against four contractors that worked on the resurfacing project.

The suit alleges that construction flaws have led to cracks and other signs of wear in the pavement. The Los Angeles Times reports that, according to court documents, the pavement may need to be replaced again much sooner than would normally be expected, leading to disruptions in operations at the airport.

"As a result of the contractors’ negligent construction, the runway is deteriorating in an accelerated fashion and will ultimately interfere with ongoing runway operations," the lawsuit, filed in  Los Angeles County Superior Court in Torrance, CA states.

Among the defects listed in the suit are early deterioration of the concrete, as well as damaged or lost concrete, mortar lift-off, and "pop-outs" of some sections of the runway.

The contractors named in the lawsuit include R & L Brosamer, HNTB Corp., CH2M Hill Inc. and a joint venture involving Tutor-Saliba Corp. and O & G Industries Inc.

FMI: www.lacity.org

 


Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC