General Dynamics Awarded $31 Million Navy F/A-18 Mission Computer Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Mar 18, 2010

General Dynamics Awarded $31 Million Navy F/A-18 Mission Computer Contract

Hardware Considered The Hornet's "Nerve Center"

General Dynamics Advanced Information Systems has been awarded a $30.6 million contract for the production of 118 Type-3 advanced mission computers (AMC) for the F/A-18 Super Hornet aircraft.  The advanced mission computer is the nerve center of the Super Hornet, providing situational awareness and combat systems control to the flight crew.

A ruggedized, high-performance/high-reliability mission and display-processing system, the AMC relies on a Commercial Off-the-Shelf (COTS), open systems architecture. It performs general purpose, input/output, video, voice and graphics processing and is designed to operate reliably in the extreme environmental conditions of today's high-performance fighter aircraft. The AMC is able to process the high-speed data flows from the latest in sensor technology.

"General Dynamics is committed to continuing its legacy of providing advanced warfighting capability to the F/A-18 program," said Lou Von Thaer, president of General Dynamics Advanced Information Systems. "Our open architecture approach allows for technology refreshes and new generations to avoid obsolescence and provide improved performance for the Navy."

General Dynamics has been delivering AMCs for the F/A-18 since 2002. Since then, the nature of the work on this program has expanded from production for newly produced aircraft to include supplying Navy efforts to retrofit operational aircraft. This contract will primarily be performed at the General Dynamics facility in Bloomington, MN, and will be completed by the end of 2011.

FMI: www.navy.mil, www.gd-ais.com

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, Nat’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

Klyde Morris (06.30.25)

What Goes Around, May Yet Come Back Around, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC