Another Delay? Dreamliner Delivery May Push To 2011 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Jul 17, 2010

Another Delay? Dreamliner Delivery May Push To 2011

Boeing Says IF It Happens, It Would Only Be "A Few Weeks" Into The New Year

The head of Boeing's 787 program said in a Friday conference call with reporters that, while the company still plans to get the Dreamliner to their launch customer late in 2010, the delivery could slip "a few weeks" into 2011.

Scott Fancher said ANA, which is scheduled to get the first of the new airliners, is being kept in the loop on the delivery schedule. The Chicago Tribune reports that Fancher said the potential delay is due in part to inspections and fixes necessary to address several production issues in planes that have already been built. Fancher did say that the most recent problem, which was discovered in the horizontal stabilizer, has been resolved, and all five Dreamliners in the test program are again flying.

Fancher said the flight test program was going somewhat slower than anticipated because each airplane has to be fitted with new test instruments as the program proceeds, which is taking longer than planned. But he said the design of the Dreamliner is not among the issues that could delay the delivery.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC