SpaceX Explores Expansion In Los Angeles Area | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Mar 22, 2018

SpaceX Explores Expansion In Los Angeles Area

Could Be Potential Manufacturing Facility For The 'Big Falcon Rocket'

SpaceX has started the process of expanding their manufacturing operation in Los Angeles into a "state of the art" facility at the Port of Los Angeles. There is some speculation that the purpose of the new facility would be to build the company's "Big Falcon Rocket" ... also known as the "BFR".

Ars Technica reports that paperwork has been filed with the Port of Los Angeles for such a facility near Long Beach. The proposed tenant is WW Marine Composites, LLC, which appears to be a SpaceX subsidiary.

In the port document, an 18-acre site at Berth 240 and the port would be used for "construction and operation of a facility to manufacture large commercial transportation vessels," including "research and development of transportation vessels and would likely include general manufacturing procedures such as welding, composite curing, cleaning, painting, and assembly operations."

The vehicles produced would be large enough to require transportation by ship, which is the reason for the site adjacent to the water.

The initial lease would be for 10 years, with two 10-year renewals available. The facility would be designed to "accommodate recovery operations undertaken by Space Exploration Technologies to bring to shore vehicles returning from space that are retrieved by an autonomous drone ship offshore."

SpaceX would only confirm that the talks with the port are underway, but would not discuss specifics. Ars says it has confirmed through an independent source that the facility would be used for the manufacture of the BFR.

(Image from file)

FMI: Original report, Port document

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC