BelugaXL Is Readied For Electrical Power-Up | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Oct 13, 2017

BelugaXL Is Readied For Electrical Power-Up

Integration Of The First Giant Airlifter Continues, First Flight Expected Next Summer

The first of five Airbus BelugaXL super transporters is well advanced in the build-up process. The project is on schedule for power-on process start at the end of this year.

During activity at Toulouse-Blagnac in southwestern France – home to Airbus’ primary industrial facility – three-quarters of the no. 1 BelugaXL’s structural assembly has been performed for the outsized aircraft.

Eric Belloc, who heads the BelugaXL final assembly activity, said all elements for the aircraft’s specially-designed tail section have now been received. These are due to be integrated on the no. 1 airframe once systems, mechanical and electrical integration – which currently is underway – is completed.

The next major step will be assembly of the front main deck cargo door, which is scheduled for the beginning of December.

Bigger and more capable than the current Beluga transporters

The first BelugaXL’s first take-off is scheduled for next summer, ahead of a 10-month flight test certification campaign. The second aircraft will start final assembly process in December, and the remaining three airlifters will be produced at a rate of one per year.

“While challenging, this really is a great project,” Belloc noted. “The Beluga is a very special aircraft – a symbol of Airbus – and we’re proud to be working on the next-generation version.”

The BelugaXL was launched in November 2014 to address the transport and ramp-up capacity requirements for Airbus beyond 2019. Derived from the freighter version of Airbus’ A330-200 jetliner, the BelugaXL is six metres longer, one metre wider and has a payload lifting capacity six tonnes greater than the current Beluga A300-600ST.

When operational, the fleet of five BelugaXLs will take over transporting complete sections of Airbus aircraft among the company’s production sites around Europe and to final assembly lines in France, Germany and Spain. BelugaXL is due to enter service in 2019.

(Image provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC