Bombardier Says It's Moving Closer to CSeries Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Nov 13, 2014

Bombardier Says It's Moving Closer to CSeries Certification

FTV1 Is Being Repaired, Other Flight Test Aircraft In Full Operation

In a video released to the media and others, Bombardier says its CSeries flight test program is moving forward towards certification of the airplane.

In the video, Robert Dewar, Bombardier's Vice President for the CSeries CS100 program, says that FTV1, the airplane that had an engine incident, "is being repaired." He said that the repair process is "a good validation of the technology" of the carbon-fiber wing structure. "The repair went very well," he said.

FTV2 has returned to flight, Dewar said, and is "performing exceptionally well."  He said the fly-by-wire technology is performing as expected in the airplane.

FTV4 is also making good progress. This is the airplane that is being used to evaluate aircraft performance. Dewar said that the anti-skid tuning system is being completed in Salina, KS, and the final performance engines have been received. He said that they are working on getting the final performance data for the airplane.

The first interior has been installed on FTV5, Dewar said.

As for the CS300, "it's powered on, painted, engines are installed, and we're getting this aircraft ready to enter the flight test program."

Finally on the ground testing side, "all the structural testing is going well. We're actually on track to finish all the testing this year." Dewar said that the fatigue article has undergone over 7,000 flight cycles.

He said that with the flight test program back underway, the company is now looking forward to entry into service for the new airliner.

(Image from YouTube video)

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC