First Ariane 5 For Launch In 2018 Begins Its Integration Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Tue, Dec 19, 2017

First Ariane 5 For Launch In 2018 Begins Its Integration Process

Will Deliver Al Yah 3 Satellite For Yahsat

The first Ariane 5 for liftoff in 2018 has begun its build-up process, kicking off preparations for another busy year of Arianespace launch activity from its French Guiana operational base.

This heavy-lift vehicle will be used for Flight VA241, which will deliver the Al Yah 3 spacecraft for Yahsat (the Al Yah Satellite Communications Company PrJSC), based in the United Arab Emirates at Abu Dhabi, along with another relay satellite.

The Arianespace mission’s designation signifies Ariane’s 241st flight since the European-built series of launch vehicles began operation in 1979.

Integration of the Ariane 5 is following well-established procedures at the Spaceport, with its cryogenic core stage positioned over one of two operational launch tables. This is being followed by the mating of two solid propellant boosters in the Spaceport’s Ariane 5 Launcher Integration Building – clearing the way for an initial vehicle “top-off” with installation of its combined cryogenic upper stage and equipment bay atop the core stage.

Ariane 5 will then be made ready for transfer to the Spaceport’s Final Assembly Building, where it will receive the two satellite passengers.

Al Yah 3 was built by Orbital ATK at the U.S. company’s satellite manufacturing facility in Dulles, Virginia. It was shipped to the launch site on November 28.

This relay platform will extend the commercial Ka-band coverage for Yahsat to an additional 600 million users across Africa and Brazil.

Al Yah 3 is the first hybrid electric propulsion GEOStar-3 satellite to be completed by Orbital ATK. The spacecraft’s hybrid electric propulsion system is designed to provide higher power and greater payload capability, while maintaining cost-effective launches and a faster path to orbit than all-electric systems.

(Source: Arianespace news release. Image from file)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Linx (08.27.25)

Aero Linx: The American Society of Aerospace Medicine Specialists (ASAMS) The Society is a non-profit organization created to serve as a voice for and represent the professional ne>[...]

ANN's Daily Aero-Term (08.27.25): Class C Service

Class C Service This service provides, in addition to basic radar service, approved separation between IFR and VFR aircraft, and sequencing of VFR aircraft, and sequencing of VFR a>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Airborne-NextGen 08.26.25: Iran UAV Knockoffs, X-37B Spaceplane, Army Training

Also: ERAU Uses UAVs, P550 Group 2 UAS, Starship’s Florida Launches, NASA Missions Chopped The Air Force has put out a call to commission a one-to-one copy of the Iranian-des>[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC