AAR Delivers First P-8A Poseidon To U.S. Navy Fleet | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, May 28, 2019

AAR Delivers First P-8A Poseidon To U.S. Navy Fleet

Completes First Planned Overhaul, Age Exploration And Planned Inspection

AAR has completed its first planned overhaul, age exploration and planned inspection of its first U.S. Navy P-8A Poseidon (P-8A) aircraft.

As part of a seven-year, indefinite-delivery/indefinite-quantity (IDIQ) contract signed last year with the Navy, AAR is providing heavy depot airframe maintenance, as well as year-round field support, for the U.S. fleet. The P-8A aircraft arrived at AAR for its first Age Exploration Plan Depot (AEPD) visit, which is part of a systematic, scheduled maintenance requirement.

"Delivering a mission-ready aircraft means executing a successful maintenance-repair plan. Many thanks to the AAR team for a job well done," said Capt. Tony Rossi, Program Manager for the NAVAIR's Maritime Patrol and Reconnaissance Program (PMA-290). "As expected, there have been no significant aircraft condition findings. The aircraft continues to fly anti-submarine and anti-surface warfare missions, humanitarian and search and rescue missions around the world, and it's performing well."

"Our team is honored to perform maintenance on the P-8A Poseidon for the U.S. Navy and ensure its operational-readiness for the warfighter," said William Patton, AAR P-8A Program Manager and 20-year U.S. Navy veteran. "With our vast experience in B737s and longstanding working relationship with military programs, AAR's P-8A Program has excelled in meeting strict government compliance standards and maintaining the quality of the aircraft."

In addition to the P-8A program, AAR has also performed service on the U.S. Navy's C-40, Clipper, Harrier Jet Sustainment, C-9 Nightingale and H60R fleets.

All of the maintenance for the P-8A Program is performed at AAR's Indianapolis facility, which has serviced over 2,000 B737 aircraft both for commercial and government customers.

(Image provided with AAR news release)

FMI: www.aarcorp.com
www.navy.mil

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC