Crew-1 Launch Readiness Review Complete, BUT Launch Delayed Additional Day | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Nov 14, 2020

Crew-1 Launch Readiness Review Complete, BUT Launch Delayed Additional Day

Crew-1 Is The First Crew Rotation Flight Of A US Commercial Spacecraft With Astronauts To ISS

Teams completed the final major review, Friday, for NASA’s SpaceX Crew-1 mission that will launch from the agency’s Kennedy Space Center in Florida to the International Space Station.

At the conclusion of the review, NASA and SpaceX agreed to target launch for 7:27 p.m. EST Sunday, Nov. 15, due to onshore winds and first stage booster recovery readiness. NASA TV coverage will begin at 3:15 p.m. The Crew Dragon is scheduled to dock to the space station at about 11 p.m. Monday, Nov. 16.

NASA astronauts Michael Hopkins, Victor Glover, and Shannon Walker, and astronaut Soichi Noguchi of the Japan Aerospace Exploration Agency (JAXA) will head to the International Space Station for a six-month science mission in the Crew Dragon spacecraft, which will launch on the SpaceX Falcon 9 rocket from Launch Complex 39A.

Crew-1 is the first crew rotation flight of a U.S. commercial spacecraft with astronauts to the space station following the spacecraft system’s official human rating certification.

The launch of the Demo-2 mission on May 30, 2020, marked the first time astronauts flew aboard the American rocket and spacecraft from the U.S. to the space station, and extensive analysis of the test flight data followed the safe return of Behnken and Hurley on Aug. 2.

Prior to Demo-2, NASA and SpaceX completed several demonstration flights to prove the system was ready to fly astronauts. In 2015, teams completed a Crew Dragon pad abort test during which the spacecraft demonstrated the ability to escape the launch pad in the event of an emergency prior to liftoff.

FMI: www.nasa.gov, www.spacex.com

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC