Boeing’s Military Commitments Create Sink or Swim Situation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Jun 21, 2025

Boeing’s Military Commitments Create Sink or Swim Situation

Planemaker Sets Out to Build Two Sixth-Gen Fighter Jets at Once

Despite the planemaker’s public confidence, the Navy Secretary has expressed concern for Boeing’s ability to fulfill two sixth-generation fighter jet contracts at one time. This is on top of several other defense-related commitments, including presidential jets.

Boeing came out on top of the competition to build the US military’s sixth-generation fighter, dubbed the F-47, in March. It aims to replace the F-22 Raptor, with a projected top speed exceeding Mach 2, a combat radius of more than 1,000 nm, and advanced technological capabilities that adapt to real-time needs and allow collaboration with drones. The Air Force hopes to field upwards of 185 F-47s and begin operation by 2029.

The US Navy is also looking for a new fighter, the F/A-XX, to serve as a replacement for F/A-18E/F and EA/18G fleets in the 2030s. However, initial 2026 budget documents show that funding for the program was cut, with Navy Secretary John Phelan citing concerns about throwing another project onto an industry with an already overloaded plate. As true as this may be, the service remains desperately in need of a new fighter.

Despite the F-47 commitment, Boeing is confident that, if it won the F/A-XX contract, it would have the capacity to handle two sixth-gen fighter builds at once.

“Absolutely we can do it, and so can the industrial base, and so can the engine manufacturers. So I don't see that as being an issue,” stated Boeing Defense and Space CEO Steve Parker at the Paris Air Show.

Parker confirmed that Boeing is allocating nearly $5 billion to expand its air dominance facilities enough to accommodate both the F-46 and F/A-XX.

“From day one, a capital investment was for both programs. We've done the same with our technology. We've done the same with our staffing. I can't get too many staffing numbers, but we have a very large number of folks working on both programs,” Parker noted.

Fighters aren’t Boeing’s only military program. The planemaker is nearing the end of the design phase for two new VC-25 presidential jets, which are already far behind schedule but may see a shift forward if regulatory hurdles are cleared.

FMI: www.boeing.com

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC