Workers At Northrop Grumman Hawkeye Plant Facing Possible Cutbacks | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-AffordableFlyers-05.08.25

AirborneUnlimited-05.09.25

Mon, Feb 02, 2009

Workers At Northrop Grumman Hawkeye Plant Facing Possible Cutbacks

Congressmen And Senators Appeal For Restoration Of Funding

A recent proposal by the US Navy to cut back production on the Northrop Grumman E-2D Advanced Hawkeye surveillance plane could impact nearly 400 jobs by springtime.

Florida senators and representatives have spearheaded a plan to help keep the E-2D Hawkeye program alive in St. Augustine, FL... writing to Secretary of Defense Robert Gates to ask him to reconsider maintaining current production levels at four aircraft per year.

"The reduction in the 2009 appropriation has significant undesired consequences for the program," their letter said. "(The E-2D) is the cornerstone of the Navy's Net-Centric Warfare concept and imperative for protection against air and missile threats. The 2009 appropriation leaves the program inadequate to sustain its transition from development to low-rate production."

Reduction of the St. Augustine plant's contract from four to three planes produced may not sound like much, but could mean the loss of 124 jobs at the factory and another 350 parts supplier jobs as soon as spring, the St. Augustine Register reported.

Planned nationwide cutbacks in the E-2D program totaling $200 million would cause a ripple effect touching over 2,600 workers and parts suppliers.

US Rep. John Mica, R-Winter Park, said there may be a chance to restore funding tucked somewhere in the Omnibus Spending Bill, scheduled to be heard March 1.

"(But) there's almost nothing in the $820 billion Economic Stimulus Bill devoted to shoring up our military," he said. "We're going to try and save the jobs. Until the (Omnibus Bill) goes to Obama's desk, we're not giving up."

FMI: www.navy.mil, www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (05.12.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

ANN's Daily Aero-Linx (05.12.25)

Aero Linx: British Helicopter Association (BHA) The BHA promotes the compliant, safe and considerate use of rotorcraft throughout the UK. Its activities are directed by a Council o>[...]

NTSB Final Report: Piper PA-36-375

During An Aerial Application Flight, The Engine Lost Power And The Airplane Began To Descend Analysis: The pilot reported that, during an aerial application flight, the engine lost>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

ANN's Daily Aero-Linx (05.13.25)

Aero Linx: HeliOffshore HeliOffshore is the global, safety-focused association for the offshore helicopter industry. Our mission is to lead a collective safety conversation, identi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC