Embraer Ready To Begin Assembly Of First Phenom 100 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Mar 31, 2007

Embraer Ready To Begin Assembly Of First Phenom 100

VLJ's Design, Production Planning Simulated Digitally

The newest very-light-jet has started to take shape in Brazil. Embraer reports that the first Phenom 100 fuselage and wing have been completed at the Company's Botucatu plant, in outstate Sao Paulo. The aircraft is now at the Sao Jose dos Campos facility for wing-fuselage mating, and final assembly.

As Aero-News reported earlier this week, the two PW617 Pratt & Whitney Canada engines have also been received by Embraer. The light turbofans are due to be installed in April.

"We are thrilled to announce yet another key milestone in the Phenom 100 program," said Luis Carlos Affonso, Embraer Executive Vice-President, Executive Jets. "The advanced technology applied to the Phenom 100 product design and manufacturing has enabled a smooth assembly of the fuselage and wings, and we have already begun the production of the second aircraft."

Embraer notes the design and production planning of the Phenom jets are entirely digital. The manufacturing of all primary parts was simulated via a digital manufacturing, and virtual numeric-control software.

After simulation, the main structures of the first Phenom 100 were built with an automated riveting machine.

With the advance of the final assembly of the first jet, the main fuselage sections and structures of the second Phenom 100 aircraft have begun the initial assembly process.

FMI: www.embraer.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC