More Troubles For ISS Water Purification System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Mar 23, 2009

More Troubles For ISS Water Purification System

Station Moved To Avoid Yet Another Chunk Of Space Debris

Problems with a vital water purification system onboard the International Space Station may be more than skin deep, after the system stubbornly refused to work during testing Sunday.

NASA reports Expedition 18 Commander Mike Fincke spent much of the day working with the Urine Processing Assembly, after installation of a new distillation assembly delivered by Discovery's STS-119 crew. The new unit was ferried up to the station after astronauts encountered problems with the system during a previous shuttle flight to the station, as ANN reported.

Proper operation of the UPA is necessary for the station to support a full six-person crew complement... due to be onboard the ISS in May.

First results were encouraging. Initially the system showed a lower than expected flow rate when attempts were made to fill the reservoir tank, but after a tank swap, the tank was filled. Reuters reports a second "dry spin" of the unit also succeeded... but when Fincke started a "wet spin" test, with actual urine, things ground to a halt.

"Once you closed valve 3 it didn't seem to flow," Fincke radioed to ground controllers. "I have no idea why that could be, so good luck with the trouble-shooting and we're standing by to answer any questions or be of any use."

Also of note Sunday, NASA repositioned the station-shuttle complex in order to avoid a piece of debris from a nine-year-old Chinese rocket, that might have come a bit too close to the ISS during Monday's planned third and final spacewalk of the STS-119 mission.

Somewhat oddly, thrusters onboard the station were used to propel the ISS ever-so-slightly closer to Earth, where the atmosphere will generate enough friction to slow the station enough to allow the debris to speed past uneventfully.

"That'll slow the whole stack down by just a bit," said mission commentator Kelly Humphries.

Mission Specialists Joe Acaba and Ricky Arnold prepared tools and equipment for their Monday morning spacewalk, before moving to the Quest airlock to "campout" in the Quest airlock to condition their bodies ahead of the spacewalk set to begin at 10:43 am EDT.

They plan to relocate an equipment cart from one side of the station's Mobile Transporter to the other; attempt to complete a deploy of a cargo carrier that exhibited a balky handle during the second spacewalk Saturday. They also will deploy a payload attach system and complete work to swap electrical relays to the station's gyroscopes.

One last task will be to lubricate the latching end effector on the station’s robotic arm -- a routine maintenance task to prevent stickiness during latching procedures.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC