Lycoming Completes SB 552 Crankshaft Replacement Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Apr 02, 2003

Lycoming Completes SB 552 Crankshaft Replacement Program

Lycoming has successfully completed the installation of replacement crankshafts in the 797 TIO-540 engines that were returned for repair under Service Bulletin 552 and has shipped these engines so they can be returned to service. Of the 601 engines tested under Service Bulletin 553, 417 have passed and most of the remaining 184 have been repaired and returned to service.

More than 1,100 crankshafts have been forged using a new, more vigorous manufacturing process and have passed newly developed tests.

"We made a promise to our customers that we would resolve this replacement and repair issue by the early part of the second quarter and we have delivered on that promise," said Richard Millman, executive in charge of Lycoming.

In the fall of 2002, Lycoming committed to replacing crankshafts in engines covered by Service Bulletins 552 and 553. Owners and operators of aircraft powered by Lycoming TIO-540 engines of more than 300 or more horsepower were required to comply with the service bulletins and to replace their crankshafts. The cost of the crankshaft replacement, as well as various related costs, were paid by Lycoming as part of its Customer Care Program. In addition to repairing and replacing internal parts, the Program includes alternate transportation or fixed costs (including interest on loans, insurance {ground insurance} and hangar rental); remote hangar fees; and an additional 12 month engine warranty from the date the engine is returned to service. More than $35 million was earmarked to cover the costs of the repair and customer care program.

"The repair process included the thorough disassembly, inspection, crankshaft replacement, assembly and full testing consistent with our commitment to flight safety," said Mike Wolf, president of Lycoming. "I am happy to report that we have met our goals ahead of schedule and sent these engines back to their owners."

FMI: www.lycoming.textron.com

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC