ERJ-145 Scratched From Aerial Common Sensor Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, Aug 12, 2005

ERJ-145 Scratched From Aerial Common Sensor Program

Airframe Not Heavy Enough, According To US Army

The Embraer ERJ-145 won't be the platform after all for the Army's new Aerial Common Sensor project. The reason? It's just not able to accomodate all the equipment the Army wants it to.

As ANN first reported last month, the ERJ-145 (file photo of type, below, right) was originally picked as part of Lockheed-Martin's winning proposal. But nobody considered that the airframe itself might be unable to accomodate all the necessary equipment.  

The light bird colonel in charge of the Army's oversight on the project, Steven Drake, told Pentagon officials in an April 25th report that "weight issues are severe enough that it has been recognized that a reliable solution, which meets all performance requirements within cost and schedule constraints, will be a significant challenge." The report was quoted by Bloomberg News.

That indeed turned out to be too much of a challenge for the ERJ airframe. "The team concluded that an alternate airframe was necessary to provide the best solution," Drake said August 8th in an e-mailed statement to Bloomberg News.

Somebody bring a checkbook.

Lockheed has already spent $270 million of the $879 million it was awarded in a preliminary contract, trying to cram all that gear and its related cooling equipment into the ERJ-145. Now, it's back to the drawing board.

"Lockheed Martin is the prime contractor and, as such, shares responsibility for the unanticipated size, weight and power-cooling issues," Drake said in the e-mail. "They have demonstrated their commitment to the success of this program by bringing the full resources of their corporation together."

Embraer isn't out of the running for the project, which is to begin deliveries to the Army in 2010. The team also includes Argon Engineering, BAE Systems, Harris Corp., L-3 Communications and Raytheon.

FMI: www.lockheedmartin.com

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC