ISS Spacewalkers Investigate Station Power Woes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, Dec 18, 2007

ISS Spacewalkers Investigate Station Power Woes

No Apparent Damage To Gimbal Assembly; Shavings Found In Joint

Expedition 16 astronauts Dan Tani and Peggy Whitson found no "smoking gun" for problems involving power generation onboard the International Space Station. The two astronauts wrapped up a 6-hour, 56-minute spacewalk focused on solar array issues at 1146 EST Tuesday morning.

NASA states the spacewalkers looked for the cause of partial loss of electrical power to one of the station's two Beta Gimbal Assemblies (BGAs) for starboard solar wings. They also examined damage to the starboard Solar Alpha Rotary Joint (SARJ) during the spacewalk, the 100th associated with assembly and maintenance onboard the ISS.

The SARJ enables the arrays to rotate to track the sun as the station orbits Earth. The BGA lets the solar wings tilt along their long axis to point more directly to the sun; the BGA's primary power was lost December 8, after three circuit breakers tripped. A backup power source still functions, but because of the loss of redundancy, the device was latched with the wing in a position suitable for docking of the shuttle Atlantis on STS-122.

Tani and Whitson found no apparent damage to BGA 1A during their 45-minute inspection. They disconnected two cables to facilitate ground tests; the circuit remained closed, apparently clearing the cables as suspects. Whitson reconnected them late in the spacewalk.

Next the spacewalkers moved to the SARJ. Working together, they removed two large drive lock assembly covers and inspected the race rings and bearings beneath them. Then they removed and inspected beneath most of the 22 covers.

That SARJ was locked after vibrations were noted and increased power consumption was seen. Inspection findings Tuesday showed various degrees of contamination under the individual covers. Generally it was similar to what had been seen previously.

Tani and Whitson described what they saw, took photos and used tape and a scraper to collect samples of debris in the SARJ. That debris included metal shavings and "dusting" in the SARJ race ring, which Tani compared to marching ants.

"It's hilarious," he reported, according to The Associated Press. "It's like it's animated, like they're alive."

The starboard array continues to produce some power, NASA reports, and no station operations have been affected. But managers want to resolve the SARJ and BGA problems before launch of the Japanese Kibo laboratory next year.

The spacewalk was the 100th for the construction and maintenance of the station. During the spacewalk, Whitson set a new record for cumulative spacewalk time by a woman.

FMI: www.nasa.gov/station

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC