GE Honda Aero Engines Begins Full Testing Of HF120 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Wed, Sep 12, 2007

GE Honda Aero Engines Begins Full Testing Of HF120

Demo Powerplant Will Be Run Up To Maximum Thrust Levels

GE Honda Aero Engines tells ANN the enginemaker has begun testing the first full HF120 demonstration engine -- including maximum thrust levels -- at Honda's Aircraft Engine R&D Center in Japan.

Over the next five months, GE Honda will conduct an array of tests on several HF120 demonstrator engine builds to verify performance operability, thermal characteristics, and component efficiencies.

This full-engine testing follows several months of engine core (hot section) tests on several builds of hardware, as ANN reported in May.

GE Honda says the aggressive HF120 test schedule this year is geared to validate significant design enhancements to the engine before full certification testing begins in 2008. Currently, the company is finalizing and releasing hardware for the seven HF120 engines in the certification program.

"This is an exciting and intense period in the development program," said Bill Dwyer, president of GE Honda Aero Engines. "We are validating our latest design enhancements through as much core- and full-engine testing as possible before the first certification engines are assembled and tested."

The GE Honda H120 engine was formally launched in October 2006, when it was selected to power both the HondaJet advanced light jet and the Spectrum Aeronautical "Freedom" business jet. To date, more than 200 HF120 engines are on order.

HF120 certification is targeted for 2009, with entry into service on both aircraft scheduled to begin in 2010.

FMI: www.gehonda.com

Advertisement

More News

ANN's Daily Aero-Term (06.02.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

ANN's Daily Aero-Linx (06.02.25)

Aero Linx: Airpower Museum The APM owns 30 acres on Antique Airfield, including the south half of the N-S runway. It consists of three hangars, an annex, and a library. The museum >[...]

NTSB Prelim: Champion 7ECA

Patient Told The First Responders That The “Man Who Was In The Plane Was Flying At The Time Of The Accident And Had Overshot The Runway They Were Attempting To Land On.&rdquo>[...]

Classic Klyde Morris (From 06.10.22)

Klyde Just Can't Believe This Has Gotten To This Point... FMI: www.klydemorris.com>[...]

Airborne 05.30.25: Anti-Helicopter Bill, PW Strike Done, All-Electric Bristell

Also: Duffy Wants $$$, KS Airports, Morningside U’s Aviation School, New Airstrip In ID After 6 were killed in a helicopter crash over the Hudson River, several US Representa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC