NASA Awards Launch Services Contract For Sentinel-6A Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Oct 24, 2017

NASA Awards Launch Services Contract For Sentinel-6A Mission

SpaceX Wins The Contract For November, 2020 Launch

NASA has selected Space Exploration Technologies (SpaceX) of Hawthorne, California, to provide launch services for the Sentinel-6A mission. Launch is currently targeted for November 2020, on a SpaceX Falcon 9 Full Thrust rocket from Space Launch Complex 4E at Vandenberg Air Force Base in California.

The total cost for NASA to launch Sentinel-6A is approximately $97 million, which includes the launch service and other mission related costs.

The Sentinel-6A mission, also known as Jason Continuity of Service (Jason-CS), is a partnership between NASA, the National Oceanic and Atmospheric Administration (NOAA), the European Space Agency, and the European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT). This mission provides operational ocean altimetry to provide continuity of ocean topography measurements and continues the long-term global sea surface height data record begun in 1992 by the Topography Experiment (TOPEX)/Poseidon and Jason 1, the Ocean Surface Topography Mission (OSTM)/Jason-2 and Jason-3 missions. A secondary objective of the mission is to collect high-resolution vertical profiles of temperature, using the Global Navigation Satellite System (GNSS) Radio-Occultation sounding technique, to assess temperature changes in the troposphere and stratosphere and to support numerical weather prediction.

NASA's Launch Services Program at Kennedy Space Center in Florida will manage the SpaceX launch service. The Sentinel-6 Project office is located at NASA's Jet Propulsion Laboratory in Pasadena, California.

(Source: NASA news release)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (11.29.25): Waypoint

Waypoint A predetermined geographical position used for route/instrument approach definition, progress reports, published VFR routes, visual reporting points or points for transiti>[...]

ANN's Daily Aero-Linx (11.29.25)

Aero Linx: Sentimental Journey to Cub Haven Sentimental Journey Flyin began in 1986 with a group of dedicated volunteers working to provide a sentimental return to Lock Haven, the >[...]

NTSB Prelim: Jabiru USA Sport Aircraft LLC J230-SP

The Pilot Would Often Fly Over Their House At A Low Altitude And That Family Members Would Go Outside To Wave On November 14, 2025, at 1708 eastern standard time, a Jabiru USA Spor>[...]

Classic Aero-TV: Crafting The Future of eVTOL Infrastructure

From 2024 (YouTube Edition): Volatus Infrastructure Paves The Way The name “Volatus” seems to be everywhere these days, popping up in a series of partnerships and proje>[...]

Klyde Morris (11.28.25)

Fortnite Conquers All, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC