Where Do You Want It? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Mon, Sep 15, 2003

Where Do You Want It?

ISS Crew Offloading Three Tons Of Progress Supplies

The unloading of nearly three tons of new supplies from a Progress cargo vehicle began in earnest this week aboard the International Space Station. Commander Yuri Malenchenko and NASA ISS Science Officer Ed Lu spent time each day unpacking, cataloging and stowing the equipment.

The ISS Progress 12 (12P) vehicle brought food, fuel and equipment to the Station Aug. 30,US time. This week, the thrusters on 12P were successfully tested and can be used to increase the Station's altitude when necessary. Also, nitrogen from the cargo vehicle's gas tanks was used to add pressure to the atmosphere inside the Station, while oxygen repressurization from 12P will occur later.

Among the new supplies were two canisters for the Resistive Exercise Device weightlifting machine, which Lu installed Friday. Coincidentally, Lu had trouble adjusting the resistance on one of the previous canisters Wednesday. He removed that set and will work to repair the problematic canister next week so that the new ones that arrived on Progress can be reserved for the next crew to live aboard the Station.

Friday, flight controllers in Mission Control Houston worked on the communication link between the Space Station and control centers in Houston (TX), Moscow and Huntsville (AL). The crewmembers noticed they were barely able to hear voice calls from the capcoms, or spacecraft communicators, from each of the centers. The problem was narrowed down to equipment in Houston that relays the audio to the Station from all the control centers.  Engineers will continue to troubleshoot the issue with the hardware. In the meantime, the audio link to the Station has been restored to normal levels by temporarily bypassing that specific piece of hardware.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (10.12.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

Aero-News: Quote of the Day (10.12.25)

“If we have a continual small subset of controllers that don’t show up to work… they’re the problem children... We need more controllers, but we need the b>[...]

Classic Aero-TV: PBY Catalina-From Wartime to Double Sunrises to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Linx (10.12.25)

Aero Linx: National Agricultural Aviation Association (NAAA) NAAA provides networking, educational, government relations, public relations, recruiting and informational services to>[...]

Airborne 10.06.25: FAA Furloughs, Airshows Hit By Shutdown, Livestream Accident

Also: Pilot Age Cap, Skylar AI Flight Assistant, NS-36 Mission, ALPA v Shutdown The federal government has officially gone into lockdown mode. The FAA will be laying off around a f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC