Australian Minister Applauds $901 M Wedgetail Sustainment Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Mar 19, 2014

Australian Minister Applauds $901 M Wedgetail Sustainment Contract

Multi-Year Agreement Covers Sustainment Of The Australian E-7A Fleet

Minister for Defense Senator David Johnston says a $901 million dollar (Australian) Wedgetail Airborne Early Warning and Control support contract unveiled today spells job security for hundreds of Australian workers. Senator Johnston said the support contract extension, signed by the Defense Material Organization, will be undertaken by Boeing Defense Australia and will ensure long-term value for money sustainment services for Defense.

The contract covers the sustainment of the Royal Australian Air Force’s E-7A Wedgetail fleet, including engineering and maintenance support, repairs, spare parts and aircrew and maintenance training for the Wedgetail fleet.
 
“The extension ensures efficient and cost-effective sustainment support, and is also testament to the effective build-up by Australian industry of E-7A Wedgetail operating, maintaining and engineering knowledge,” Senator Johnston said. “This is a significant outcome for the Wedgetail program and for the 290 industry staff employed directly on Wedgetail support in the Newcastle, Brisbane/Ipswich and Adelaide regions.
 
The E-7A Wedgetail represents an advanced and entirely new capability for the Australian Defense Force, providing a platform that gathers information from a wide variety of sources analyses it and distributes it to other aircraft and surface assets.
 
Of the $901 million, $433 million is being spent in Australia; $275m in Newcastle, $80m for Brisbane and Ipswich and $78m for Adelaide.
 
The Airborne Early Warning and Control capability operated by 2 Squadron at RAAF Williamtown consists of six E-7A Wedgetail aircraft, a full flight simulator, an operational mission simulator, a software development and test laboratory and maintenance facilities.

(Image provided by the Australian Ministry of Defense)

FMI: www.defense.gov.au

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC