Bell 360 Invictus Build Makes Significant Progress for Army's FARA Prototype Com | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.18.25

Airborne-FlightTraining-06.19.25

AirborneUnlimited-06.20.25

Sat, Aug 14, 2021

Bell 360 Invictus Build Makes Significant Progress for Army's FARA Prototype Com

Invictus Team Has Completed Multiple Design And Risk Reviews With The Army

Bell Textron has released new data on the build and testing for the Bell 360 Invictus competitive prototype.

The Bell 360 program is reportedly rapidly progressing through manufacturing, assembly, components testing, and systems integration work for the U.S. Army’s Future Attack Reconnaissance Aircraft (FARA) program. The team has completed multiple design and risk reviews with the Army and is on schedule for all program requirements. The Bell 360, a low-risk, high-speed platform with proven technology and inherently reliable designs, will deliver soldiers transformational operational capabilities.

“This team is achieving great results responding to requirements, reducing programmatic risk, and delivering state-of-the-art capabilities for the Army,” said Chris Gehler, vice president and program director for the Bell 360 Invictus. “We are combining Bell’s unique knowledge of the demands placed on scout aircraft with engineering and technical expertise to give the Army a weapon system to dominate attack reconnaissance missions for decades to come.”

Since beginning the build in late 2020, Bell has made progress on the Bell 360 Invictus fuselage, main rotor blades, gearbox assembly, cases, and other high-value components. By implementing a design-as-built methodology that digitally connects the entire program throughout its lifecycle, Bell has increased its ability to collaborate in real-time with program partners and the Army. This method accelerates decision-making among distributed teams using a common, secure data environment that creates a singular source of data for the program leading to reduced assembly, rework time and cost.

Along with assembling the Bell 360 Invictus, high-value components such as the main rotor gearbox, driveshafts and couplings are being tested at Bell’s Drive Systems Test Lab (DSTL). The DSTL is used to carry out risk-reduction efforts that ensure the program has accurate and verified data to qualify components in advance of flight test.

A new FARA-specific Systems Integration Lab (SIL) is also operational at Bell. This facility allows Bell to integrate flight-critical components, software, and mission systems for testing, verification, and validation of functionality before they take flight on an actual aircraft. This approach reduces technical risk and aids in the safe, rapid, and efficient execution of flight test program.

“The Bell 360 Invictus is an exciting aircraft that brings sophisticated digital systems together in a high-speed, reliable, maintainable vehicle for austere environments around the world,” said Jayme Gonzalez, program manager, Bell 360 Invictus. “The Bell 360 offers the Army the ability to modernize using simplified and inherently reliable designs to reduce costs and deliver enhanced effectiveness for the Army.”

FMI: www.bellflight.com

Advertisement

More News

ANN's Daily Aero-Term (06.21.25): Marker Beacon

Marker Beacon An electronic navigation facility transmitting a 75 MHz vertical fan or boneshaped radiation pattern. Marker beacons are identified by their modulation frequency and >[...]

ANN's Daily Aero-Linx (06.21.25)

Aero Linx: AirVenture Oshkosh The Experimental Aircraft Association (EAA) is a growing and diverse organization of members with a wide range of aviation interests and backgrounds. >[...]

NTSB Prelim: Lancair 360

Once The Pilot Maneuvered The Airplane For Landing On Runway 12, The Cockpit Was Filled With Smoke On June 11, 2025, about 2145 central daylight time, a Lancair 360 airplane, N77LH>[...]

Classic Aero-TV: Vision Products LLC Introduces PilotVision Monocular HUD

From 2022 (YouTube Edition): The Well-Appointed Eye in the Sky Established in 2009 as the Vision Products Division of SA Photonics Inc. and spun-off as an independent business enti>[...]

Airborne-NextGen 06.17.25: JetZero Finds A Home, VX4 eVTOL, H55’s B23 Energic

Also: Electric Aircraft Symposium, Radia Windrunner Avionics, AIRO Debut, NASA’s Orion Ready California-based aerospace start-up JetZero has formally selected Greensboro, Nor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC