Orion Feels The Vibe During Tests At Kennedy Space Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Tue, Apr 29, 2014

Orion Feels The Vibe During Tests At Kennedy Space Center

Marks Another Milestone Towards Initial Unmanned Test Flight

Testing designed to simulate the vibrations NASA's Orion will experience during its first trip to space successfully wrapped up inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The completion of the testing marks another step forward toward Orion's uncrewed December flight that will put to the test the spacecraft that will send astronauts to an asteroid and eventually Mars on future missions.

"It was a great accomplishment for the test team in preparation for the Exploration Flight Test-1 later this year," said Rafael Garcia, the Orion Program Test and Verification lead at NASA's Johnson Space Center in Houston. "Following months of preparations and pretest analysis, the multi-point random vibration test was conducted without any major issues and was completed two days ahead of schedule."

To prepare for the vibration tests, which were conducted April 17-24, a team of NASA and Lockheed Martin engineers and technicians transferred Orion from the crew module assembly station to a special vibration stand in a portable test chamber. The spacecraft was isolated from the floor and stand on special footing. Orion's thrusters were cantilevered out so they were isolated from the test, and its windows, parachutes and drogue chutes were covered for protection. 

Accelerometers and strain gages were placed around the crew module in various locations. These were used to measure simulated acceleration and strain levels on Orion's structure.

Two electromagnetic shakers, each capable of up to 4,000 pounds of force, were attached to Orion on opposite sides. Baseline vibration tests began at five megahertz and gradually were increased up to about 500 megahertz. After each test run, the shakers were relocated to different points on Orion and systems specialists checked for any changes or abnormalities in the spacecraft's structure.     

Garcia said that preliminary analysis of the test data confirmed that Orion's structure performed as predicted. Before each thirty-second test run, Orion's avionics, batteries and electrical systems were powered up and its ammonia and helium tanks were pressurized to 200 psi.

The tests were monitored in a separate control room near the high bay, and the data after each 30-second run was analyzed to check for imperfections or defects and how the crew module performed. A flight following team in Firing Room 1 in Kennedy's Launch Control Center monitored Orion during periods of powered-up testing. "Shut-down limits were established in case the vibrations began to exceed limits," said Trevor Kott, the Orion Crew and Service Module ground test manager at Johnson. "This kind of test can be very complicated. There's a science to finding the right balance."

During the vibration test, other instrumentation on Orion was monitored for its state of health. "The completion of the test is a great accomplishment for the test team and NASA's Orion Program in preparation for EFT-1," Garcia said.

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC