Boeing Adjusts 747-8 Production Rate | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Apr 22, 2013

Boeing Adjusts 747-8 Production Rate

Lower Market Demand Cited For The Move

Boeing will adjust the production rate for the 747-8 program from two airplanes to 1.75 airplanes per month because of lower market demand for large passenger and freighter airplanes. Boeing will continue to monitor market conditions and their effect on production rates moving forward. The company expects long-term average growth in the air cargo market to resume in 2014, and forecasts a demand for 790 large airplanes (such as the 747-8 Intercontinental) to be delivered worldwide over the next 20 years.

The 747-8 family provides airlines with double-digit improvements in fuel burn, operating costs and emissions, while being 30 percent quieter and adding more capacity. To date, there are 110 orders for passenger and cargo versions of the 747-8, 46 of which have been delivered.

The first delivery of an airplane at the new production rate is expected in early 2014. The production rate change is not expected to have a significant financial impact.

At the end of last year, Boeing reportedly had 67 unfilled orders on the books for the stretched version of the 747. Those included 39 freighters and 28 Intercontinental passenger aircraft. The company is building at a rate of 24 per year currently, but all of the delivery slots for 2014 have not been claimed. Boeing said if it is unable to fill those slots, it will have to cut the number of airplanes coming off the assembly line.

(747-8 Intercontinental image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC