U.S. Navy Awards Raytheon $112 Million Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sun, Dec 29, 2019

U.S. Navy Awards Raytheon $112 Million Contract

Will Deliver Miniature Air-Launched Decoys To The Navy

Raytheon Company was awarded a U.S. Navy contract for the Miniature Air-Launched Decoy – Navy, as announced by the U.S. Department of Defense on Dec. 20, 2019.

Raytheon Missile Systems in Tucson, Arizona, is awarded a $112,267,649 modification to a previously awarded cost-plus-incentive-fee contract. This modification provides non-recurring engineering support throughout the engineering and manufacturing development phase as well as through payload integration and transition to production for the MALD-N.

Work will be performed in Tucson (65%); and Goleta, California (35%), and is expected to be completed in September 2022. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

(Image provided with Raytheon news release)

FMI: www.raytheon.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC