ADs (2): Rolls-Royce | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jan 03, 2003

ADs (2): Rolls-Royce

AD NUMBER:  2002-23-12
MANUFACTURER: Rolls Royce
SUBJECT:  Airworthiness Directive 2002-23-12
SUMMARY:  This amendment adopts a new airworthiness directive (AD) that is applicable to Rolls-Royce Limited, Aero Division-Bristol, S.N.E.C.M.A (RR) Olympus 593 Mk. 610-14-28 turbojet engines.

This action requires a one-time fluorescent penetrant inspection (FPI) of certain rebroached stage 5 high pressure compressor (HPC) disks, inspecting for cracks, and if necessary, removing cracked disks from service. This amendment is prompted by a manufacturer's analysis that concluded that the rebroaching process failed to achieve the anticipated life before being rejected for cracks and that the original cracks are not being removed. The actions specified in this AD are intended to prevent failure of the HPC stage 5 disk which could result in an uncontained engine failure and damage to the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20022312

AD NUMBER:  2002-26-04
MANUFACTURER: Rolls Royce
SUBJECT:  Airworthiness Directive 2002-26-04
SUMMARY:  This amendment adopts a new airworthiness directive (AD) that is applicable to certain serial number (SN) Rolls-Royce Limited, Aero Division-Bristol, S.N.E.C.M.A. (RR) Olympus 593 Mk.610-14-28 turbojet engines, installed in BAe/SNIAS Concorde Type 1 airplanes. This action requires second stage fuel pump endurance bench-testing if the pump has not yet accumulated 50 flight hours since last installed and the bearing assembly and or the rotating assembly were removed or re-fitted during last pump removal. This amendment is prompted by a report of second stage fuel pumps that were not endurance bench-tested after having the bearing assembly and or the rotating assembly removed or re-fitted, and then installed on engines in service. The actions specified in this AD are intended to prevent a fuel leak resulting in a sustained engine fire.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20022604

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC