ADs (2): Rolls-Royce | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jan 03, 2003

ADs (2): Rolls-Royce

AD NUMBER:  2002-23-12
MANUFACTURER: Rolls Royce
SUBJECT:  Airworthiness Directive 2002-23-12
SUMMARY:  This amendment adopts a new airworthiness directive (AD) that is applicable to Rolls-Royce Limited, Aero Division-Bristol, S.N.E.C.M.A (RR) Olympus 593 Mk. 610-14-28 turbojet engines.

This action requires a one-time fluorescent penetrant inspection (FPI) of certain rebroached stage 5 high pressure compressor (HPC) disks, inspecting for cracks, and if necessary, removing cracked disks from service. This amendment is prompted by a manufacturer's analysis that concluded that the rebroaching process failed to achieve the anticipated life before being rejected for cracks and that the original cracks are not being removed. The actions specified in this AD are intended to prevent failure of the HPC stage 5 disk which could result in an uncontained engine failure and damage to the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20022312

AD NUMBER:  2002-26-04
MANUFACTURER: Rolls Royce
SUBJECT:  Airworthiness Directive 2002-26-04
SUMMARY:  This amendment adopts a new airworthiness directive (AD) that is applicable to certain serial number (SN) Rolls-Royce Limited, Aero Division-Bristol, S.N.E.C.M.A. (RR) Olympus 593 Mk.610-14-28 turbojet engines, installed in BAe/SNIAS Concorde Type 1 airplanes. This action requires second stage fuel pump endurance bench-testing if the pump has not yet accumulated 50 flight hours since last installed and the bearing assembly and or the rotating assembly were removed or re-fitted during last pump removal. This amendment is prompted by a report of second stage fuel pumps that were not endurance bench-tested after having the bearing assembly and or the rotating assembly removed or re-fitted, and then installed on engines in service. The actions specified in this AD are intended to prevent a fuel leak resulting in a sustained engine fire.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20022604

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC