Boeing Completes P-8A Weapons Ground Vibration Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Tue, Feb 16, 2010

Boeing Completes P-8A Weapons Ground Vibration Tests

Needed Step Before Flight Testing Later This Year

Boeing successfully completed stores (weapons) ground vibration testing on P-8A Poseidon test aircraft T1 on February 5 in Seattle. The tests will provide data to validate predictions of aircraft performance prior to flight testing at Naval Air Station Patuxent River, MD, later this year.

During the month long series of tests, 18 different weapons configurations were loaded onto the test aircraft. For each test condition, external shakers induced vibration of the aircraft's wings, stabilizer and stores to verify the stores' effect on the P-8A's fuselage. The aircraft's response was measured with more than 100 accelerometers and other external devices.

"T1 responded as predicted throughout the rigorous set of tests," said Chuck Dabundo, Boeing vice president and P-8 program manager. "This is a major milestone for the team and paves the way for in-flight testing and verification of the P-8A's weapons capabilities."

Photo Courtesy Boeing

The Boeing P-8 team completed a successful ground vibration test of the full aircraft, minus weapons, in May 2009.

T1 is one of five test aircraft being assembled and tested as part of the System Development and Demonstration contract Boeing received in 2004. The U.S. Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft. Initial operational capability is planned for 2013.

FMI: www.boeing.com
 

Advertisement

More News

ANN's Daily Aero-Term (10.13.25): Homing [ICAO]

Homing [ICAO] The procedure of using the direction-finding equipment of one radio station with the emission of another radio station, where at least one of the stations is mobile, >[...]

ANN's Daily Aero-Linx (10.13.25)

Aero Linx: European Regions Airline Association (ERA) The European Regions Airline Association (ERA) represents a diverse membership of over 50 airlines and more than 150 associate>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

NTSB Prelim: CubCrafters Carbon Cub

While On Short Final, About 300 Ft, The Pilot Performed A Forced Landing Near Trees On September 7, 2025, about 0932 eastern daylight time, a CubCrafters Carbon Cub EX airplane, N4>[...]

ANN's Daily Aero-Term (10.14.25): Severe Icing

Severe Icing The rate of ice accumulation is such that ice protection systems fail to remove the accumulation of ice and ice accumulates in locations not normally prone to icing, s>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC