USAF Takes Tougher Stance On Tanker Talks With EADS, Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Thu, Aug 16, 2007

USAF Takes Tougher Stance On Tanker Talks With EADS, Boeing

Wants Fixed Pricing For All Early Orders; Decision Delayed

The US Air Force continues to take a hard line with competitors for its latest aircraft contract. The USAF's top acquisition officer told teams from Boeing and Northrop Grumman this week the armed service wants a fixed price for the initial batch of 80 aerial tankers.

Bloomberg News reports that's a shift from past practices -- in which the Air Force sought bids on only the first few production batches of each competitor, and delayed negotiations on later orders until a winner was selected.

In essence, the move forces Boeing and Northrop/EADS to put their best prices forward right from the start in the KC-X competition -- rather than tantalizing the Air Force with an attractive opening bid, and then raising prices later.

" That's when we found a lot of increased costs," Air Force Assistant Secretary for Acquisition Sue Payton said Tuesday. This time, "they'll be bidding knowing they have competition, so they have to be careful."

The decision to require a fixed price will push the final decision on KC-X until December, about two months later than originally planned. But the delay is worth it, Payton adds, to show the contest was fair.

"We are documenting every single question, every single answer," she said. "The selection-decision document has got to be written with enough detail" to show the losing party "exactly why they lost."

The fixed price stipulation would apply to nearly half of the 179-plane order over 15 years. Boeing has offered a tanker variant of its 767 commercial airliner in the competition; Northrop is fielding a variant of the Airbus A330-200.

Boeing's KC-767 is smaller, and offers less in the way of cargo capacity than the KC-30... but it is also cheaper than the EADS plane, and is also seen as having the advantage of being the lone all-American offering.

But don't be so quick to hand Boeing the win, according to two defense analysts -- who say the fixed price stipulation may work to EADS' favor.

"They are expected to offer a very low-priced aircraft because Airbus is eager to penetrate the North American market," Lexington Institute analyst Loren Thompson said of the EADS/Northrop team. "That will put great pressure on Boeing to meet the price even if it means lower profit margins."

Richard Aboulafia of the Teal Group agreed, saying the fixed price strategy is well-suited for the price breaks EADS is prepared to offer, in order to score the win over its American rival.

"Boeing is more focused on profitability," said Aboulafia, adding the KC-30 still offers higher long-term operating costs, which will be taken into consideration by the Air Force.

The eventual winner of the KC-X contract will replace the Air Force's current fleet of Boeing-built KC-135s, the average age of which is 44 years old.

FMI: www.af.mil, www.boeing.com/ids/globaltanker/index.html, www.northropgrumman.com/kc30/

Advertisement

More News

ANN's Daily Aero-Term (10.13.25): Homing [ICAO]

Homing [ICAO] The procedure of using the direction-finding equipment of one radio station with the emission of another radio station, where at least one of the stations is mobile, >[...]

ANN's Daily Aero-Linx (10.13.25)

Aero Linx: European Regions Airline Association (ERA) The European Regions Airline Association (ERA) represents a diverse membership of over 50 airlines and more than 150 associate>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

NTSB Prelim: CubCrafters Carbon Cub

While On Short Final, About 300 Ft, The Pilot Performed A Forced Landing Near Trees On September 7, 2025, about 0932 eastern daylight time, a CubCrafters Carbon Cub EX airplane, N4>[...]

ANN's Daily Aero-Term (10.14.25): Severe Icing

Severe Icing The rate of ice accumulation is such that ice protection systems fail to remove the accumulation of ice and ice accumulates in locations not normally prone to icing, s>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC