Clock Ticking On Sprint-LightSquared Deal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Tue, Jan 03, 2012

Clock Ticking On Sprint-LightSquared Deal

Extension Granted To Finalize A 15-Year Agreement Between The Two Companies

That sense of urgency that came through in the latest filing by LightSquared with the FCC asking that it expedite approval of plan to build a 4G wireless data network may stem at least in part from a deadline imposed by Sprint Nextel Corp, which had agreed to share network expansion and equipment costs over the next 15 years.

But the deal was predicated on the FCC granting LightSquared permission to use the spectrum, and the original deadline on the agreement was December 31st. With that date now past, Dow Jones Newswires reports that Sprint has granted a 30 day extension for LightSquared to get the required approvals so that construction of the broadband infrastructure can get underway.

In it's filing, LightSquared asked the FCC to rule that the interference issue with existing GPS receivers was entirely the responsibility of the GPS industry, which LightSquared said had sold non-compliant receivers to the public. The company has come under fire from Congress and the Defense Department as well as the industry for planning to build a system that would render millions of deployed devices crippled or useless without retrofit filters.

LightSquared says that the strategic alliance with Spring will save the company $13 billion over the next 8 years, but that it will still need to identify an additional $3.5 billion in funding to realize a positive cash flow by 2014.

FMI: www.lightsquared.com, www.sprint.com, www.fcc.gov

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC