Archer Aviation Reaches 400 Test Flights In Eight Months | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.08.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Thu, Sep 05, 2024

Archer Aviation Reaches 400 Test Flights In Eight Months

2024 Goal Attained Ahead Of Schedule

Archer Aviation, developer of electric air taxi aircraft, announced it exceeded its goal of 400 test flights for the year by completing 402 flights in just eight months, approximately four months ahead of schedule.

The company has been accelerating its flight test operations prior to conducting for-credit flight testing in conjunction with the FAA. Each test flight yields valuable data used for evaluation and refinement of aircraft performance, vibrations, loads, and handling characteristics.

In recent flights, Archer’s flight test team has concentrated on five areas:

  • Transition Flights: longer-distance and higher speed transitions for endurance and safety
  • High-Rate Operations: increasing number of per-day flights simulating anticipated commercial operations
  • Advancing Landing Profiles: performing hover landings in various wind conditions and rates of descent
  • Enhancing Acoustic Measurement: conducting hovers with various microphone arrays
  • Optimizing Control Laws: regressing through a series of optimizations of control laws to extend Midnight’s endurance

Adam Goldstein, Archer CEO and Founder said, “When we first set our goal for 400 flights this year it was viewed as aggressive, but here we are in August already knocking it out. I’m proud of the Archer flight test team and the supporting groups that made it happen.”

Archer achieved a significant milestone earlier this year when it received FAA certification in June to begin operations as a commercial airline.

FMI:  www.archer.com/

Advertisement

More News

NTSB Prelim: Lancair NLA-275-FR-C

About 2132 And At 11,800 Ft MSL, The Airplane Began A Rapid Right Spiraling Descent On August 18, 2025, about 2133 central daylight time, a Lancair NLA-275-FR-C airplane, N345LA, w>[...]

ANN's Daily Aero-Linx (09.12.25)

Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]

Aero-News: Quote of the Day (09.12.25)

"This first FAA certification enables us to address the pilot shortage crisis with modern training solutions. Flight schools need alternatives to aging fleets with 40-year-old desi>[...]

ANN's Daily Aero-Term (09.12.25): North Atlantic High Level Airspace (NAT HLA)

North Atlantic High Level Airspace (NAT HLA) That volume of airspace (as defined in ICAO Document 7030) between FL 285 and FL 420 within the Oceanic Control Areas of Bodo Oceanic, >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC