Boeing Confirms P-8A Poseidon Airframe's Structural Integrity | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Jan 21, 2011

Boeing Confirms P-8A Poseidon Airframe's Structural Integrity

Full Scale Static Tests Exceed Highest Expected Flight Loads By 50 Percent

Boeing said Thursday that it completed full scale static testing of the P-8A Poseidon’s airframe on Jan. 7. The series of tests, which began in May 2009, confirmed the airframe's structural integrity. “The structure performed as we expected throughout testing, allowing us to efficiently expand the P-8A’s flight-test envelope,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “Our static test plan was successful thanks to the combined efforts of Boeing’s design, analysis, and test teams and our U.S. Navy customer.”

S1 -- the program’s full-scale static ground-test vehicle -- underwent 154 different tests in which it sustained loads equal to or greater than those expected to occur during operational flights, with no failure of the primary structure. During 74 of the tests, the airframe was subjected to 150 percent of the highest expected flight loads. More than 4,000 installed strain gages and calibrated parts captured data for analysis.

In September, the Boeing P-8A team will begin refurbishing S1 to prepare it for live-fire testing at Naval Air Warfare Center, China Lake, Calif. Boeing will begin fatigue tests on its second ground-test vehicle, S2, later this year. The Navy plans to purchase 117 of the P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

A derivative of the Boeing Next-Generation 737-800, the P-8A Poseidon is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

FMI: www.boeing.com

Advertisement

More News

NTSB Prelim: Lee Aviation LLC JA30 SuperStol

A Puff Of Smoke Came Out From The Top Of The Engine Cowling Followed By A Total Loss Of Engine Power On May 9, 2025, about 1020 mountain daylight time, an experimental amateur-buil>[...]

Classic Aero-TV: Curtiss Jenny Build Wows AirVenture Crowds

From 2022 (YouTube Edition): Jenny, I’ve Got Your Number... Among the magnificent antique aircraft on display at EAA’s AirVenture 2022 was a 1918 Curtiss Jenny painstak>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

ANN's Daily Aero-Term (05.31.25): Microburst

Microburst A small downburst with outbursts of damaging winds extending 2.5 miles or less. In spite of its small horizontal scale, an intense microburst could induce wind speeds as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC