ISS Spacewalk To Repair Cooling System Moved To Saturday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Aug 06, 2010

ISS Spacewalk To Repair Cooling System Moved To Saturday

Second EVA Scheduled For August 11 To Complete Repairs

The first of two spacewalks by NASA astronauts to replace a failed ammonia pump on the International Space Station has been moved to Saturday, August 7. A second spacewalk is planned for Wednesday, August 11, to complete the repairs.

Teams of flight controllers, engineers, and spacewalk experts have made significant progress in preparing for the first spacewalk, but need an additional day to get ready. The additional time allows for final procedures to be sent late Thursday to the station, giving the crew a full day to review the plans developed by Mission Control.

Managers also moved the second spacewalk to Wednesday to give the crew more time to rest and prepare.

Expedition 24 Flight Engineers Doug Wheelock and Tracy Caldwell Dyson are scheduled to perform the spacewalks, which are both scheduled to begin at 6:55 a.m. Saturday's spacewalk will be the fourth for Wheelock and the first for Caldwell Dyson.


(L-R) Tracy Caldwell Dyson, Doug Wheelock

Engineers and flight controllers continue to review data on the July 31 pump failure, which caused the loss of one of two cooling loops aboard the station. This failure resulted in a power down and required adjustments to maintain as much redundancy as possible for the station systems. The systems are stable, and the station's six crew members are not in any danger.

FMI: www.nasa.gov

Advertisement

More News

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

Classic Aero-TV: The PB4Y-2 Privateer - A Priceless Aero-Treasure

From 2015 (YouTube Version): Oshkosh Reveals Many Treasures... Including Old Warbirds Full Of History While at EAA AirVenture 2015, ANN News Editor, Tom Patton, ventured out to vis>[...]

Aero-News: Quote of the Day (07.14.25)

"The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned >[...]

ANN's Daily Aero-Term (07.14.25): Temporary Flight Restriction (TFR)

Temporary Flight Restriction (TFR) A TFR is a regulatory action issued by the FAA via the U.S. NOTAM System, under the authority of United States Code, Title 49. TFRs are issued wi>[...]

ANN's Daily Aero-Linx (07.14.25)

Aero Linx: Aviation Without Borders Aviation Without Borders, a leading humanitarian aviation charity, uses its aviation expertise, contacts and partnerships to enable support for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC