Mars Phoenix To Bake Ice-Rich Sample Next Week | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Jul 05, 2008

Mars Phoenix To Bake Ice-Rich Sample Next Week

But TEGA Instrument May Short Circuit Again

The next sample delivered to NASA's Phoenix Mars Lander's Thermal and Evolved-Gas Analyzer (TEGA) will be ice-rich, researchers involved with the project said Thursday. But the instrument may once again have difficulties in determining that.

A team of engineers and scientists assembled to assess TEGA after a short circuit was discovered in the instrument, has concluded that another short circuit could occur when the oven is used again.

"Since there is no way to assess the probability of another short circuit occurring, we are taking the most conservative approach and treating the next sample to TEGA as possibly our last," said Peter Smith, Phoenix's principal investigator.

A sample taken from the trench informally named "Snow White" that was in Phoenix's robotic arm's scoop earlier this week likely has dried out, so the soil particles are to be delivered to the lander's optical microscope on Thursday, and if material remains in the scoop, the rest will be deposited in the Wet Chemistry Laboratory, possibly early on Sunday.

The mission teams marked the Independence Day holiday with a planned "stand down" from Thursday morning, July 3 to Saturday evening, July 5. A skeleton crew at the University of Arizona in Tucson, at NASA's Jet Propulsion Laboratory in Pasadena, CA, and Lockheed Martin Space Systems in Denver, CO will continue to monitor the spacecraft and its instruments over the holiday period.

"The stand down is a chance for our team to rest, but Phoenix won't get a holiday," Smith said. The spacecraft will be operating from pre-programmed science commands, taking atmospheric readings and panoramas and other images.

Once the sample is delivered to the chemistry experiment, Smith said the highest priority will be obtaining the ice-rich sample and delivering it to TEGA's oven number zero.

In a few days the Phoenix team will conduct tests so the instruments can deliver the icy sample quickly, so no materials sublimate, or change from a solid to a vapor, during the delivery process.

The short circuit was believed to have been caused when TEGA's oven number four was vibrated repeatedly over the course of several days to break up clumpy soil delivered to oven number 4. Delivery to any TEGA oven involves a vibration action, and turning on the vibrator in any oven will cause oven number 4 to vibrate as well.

FMI: www.nasa.gov/phoenix, http://phoenix.lpl.arizona.edu

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC