AD: Boeing Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, May 21, 2018

AD: Boeing Airplanes

AD NUMBER: 2018-10-08

PRODUCT: Boeing Model 717-200 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-09-05, which applied to the aircraft listed above.

AD 2016-09-05 required a detailed inspection for distress of the vertical stabilizer leading edge skin, and related investigative and corrective actions if necessary.

It also required, for certain airplanes, repetitive inspections of the front spar cap for any loose or missing fasteners, or any cracking, and related investigative and corrective actions if necessary.

This AD requires repetitive inspections for distress, cracking, and loose or missing fasteners in the vertical stabilizer leading edge skin and front spar cap, with new compliance times for certain airplanes.

This AD was prompted by reports of cracking in the leading edge of the vertical stabilizer and front spar web.

DATES: This AD is effective May 31, 2018. Comments must be received by May 31, 2018.

COST: The FAA estimates  that this AD affects 106 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspections for distress (retained actions from AD 2016-09-05) - $935 per aircraft per inspection cycle.
  • Repetitive inspections for cracking and loose or missing fasteners (retained actions from AD 2016-09- 05) - $595 per aircraft per inspection cycle.
  • The new requirements of this AD add no additional economic burden.
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC