Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Wed, Mar 30, 2005

Successful Test: Falcon 50-4 Nacelle-Nozzle Integration Test

Premier Aircraft, Honeywell Call For 2005 Certification

The recently announced performance upgrade from Premier Aircraft for the Dassault Falcon 50, called the Falcon 50-4, has passed its first engineering milestone: the integration test of the existing nacelle and new engine nozzle at Honeywell’s engine facilities in Phoenix, AZ.

The test results validate the engineering predictions for the first phase of the new nozzle development and verify the Honeywell estimates of thrust and thrust specific fuel consumption (TSFC) that support Premier’s performance estimates for the Falcon 50-4. The upgraded aircraft, powered by three TFE-731-4 engines, is expected to have longer range, increased hot-high performance (for significantly increased payloads), increased climb performance and higher cruise thrust, than the original-specification aircraft.

Premier Aircraft and Honeywell plan further investigation of nozzle designs to determine if further revisions in nozzle configuration will produce additional performance benefits for the Falcon 50-4.

Premier Aircraft will begin certification of the Falcon 50-4 Performance Upgrade upon obtaining a minimum of ten customers. Jim Swehla, Premier Aircraft president, reports brisk sales activity since the announcement of the Falcon 50-4 program at the 2004 Convention of the National Business Aviation Association, with over 20 qualified inquiries identified in the last two months. Premier says it's offering incentives to its first ten customers and expects the STC effort to commence on schedule during the first quarter of 2005, with award of the STC planned for fourth quarter 2005.

Price of the performance upgrade is $2.305 million, but may be much less for customers enrolled on MSP. In addition, a special MSP rate and engine warranty is provided with the upgrade, as is an extended CZI interval.

FMI: www.premierair.com

Advertisement

More News

ANN's Daily Aero-Term (06.02.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

ANN's Daily Aero-Linx (06.02.25)

Aero Linx: Airpower Museum The APM owns 30 acres on Antique Airfield, including the south half of the N-S runway. It consists of three hangars, an annex, and a library. The museum >[...]

NTSB Prelim: Champion 7ECA

Patient Told The First Responders That The “Man Who Was In The Plane Was Flying At The Time Of The Accident And Had Overshot The Runway They Were Attempting To Land On.&rdquo>[...]

Classic Klyde Morris (From 06.10.22)

Klyde Just Can't Believe This Has Gotten To This Point... FMI: www.klydemorris.com>[...]

Airborne 05.30.25: Anti-Helicopter Bill, PW Strike Done, All-Electric Bristell

Also: Duffy Wants $$$, KS Airports, Morningside U’s Aviation School, New Airstrip In ID After 6 were killed in a helicopter crash over the Hudson River, several US Representa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC