NASA Selects Contractor To Prepare Launch Structure For Mars Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 17, 2015

NASA Selects Contractor To Prepare Launch Structure For Mars Launch

Fixed-Price Contract Worth $45.8 Million For Construction Company

NASA has selected J. P. Donovan Construction, Inc., of Rockledge, Florida to begin work at the agency’s Kennedy Space Center in Florida on the ground structures that will launch NASA’s next generation rocket and spacecraft on the journey to Mars and other deep space destinations.

The Ground Systems Development and Operations (GSDO) Mobile Launcher Ground Support Equipment Installation contract is a firm, fixed-price contract that extends for 455 calendar days and has a maximum value of $45.8 million. Significant subcontractors are Core Electric of Melbourne, Florida; MDI Services, LLC of Orlando, Florida; and Bragg Crane & Rigging of Long Beach, California.

J.P. Donovan Construction will install and integrate ground support equipment onto the existing Mobile Launcher to modify the structure with systems necessary to assemble, process and launch NASA’s integrated Space Launch System rocket and Orion spacecraft.

GSDO’s primary objective is to prepare Kennedy to process and launch the next generation vehicles and spacecraft designed to achieve NASA's goals for space exploration. To achieve this transformation, program personnel are developing the necessary ground systems while refurbishing and upgrading infrastructure and facilities to meet tomorrow's demands. This modernization effort keeps flexibility in mind, in order to accommodate a multitude of government, commercial and other customers.

(Image from file)

FMI: www.nasa.gov/groundsystems

Advertisement

More News

ANN's Daily Aero-Term (12.04.25): Cooperative Surveillance

Cooperative Surveillance Any surveillance system, such as secondary surveillance radar (SSR), wide-area multilateration (WAM), or ADS-B, that is dependent upon the presence of cert>[...]

ANN's Daily Aero-Linx (12.04.25)

Aero Linx: OX5 Aviation Pioneers Incorporated in 1955 as a Pa 501 (c)(3) Not for Profit Corporation, the OX5 Aviation Pioneers is dedicated to bringing before the public the accomp>[...]

NTSB Prelim: Extra Flugzeugproduktions EA 300/SC

The Pilot Appeared To Regain Control After Six Rotations And Attempted To “Fly Out” Inverted But Had Insufficient Altitude On November 8, 2025, at 1038 eastern standard>[...]

Classic Aero-TV: The Bally Bomber - The All Time Ultimate Warbird Replica?

From 2018 (YouTube Edition): Aero-News Talks With The Airplane's Builder One of the many unique airplanes at AirVenture 2018 was a 1/3-scale B-17 bomber built by Jack Bally, who ta>[...]

ANN's Daily Aero-Linx (12.05.25)

Aero Linx: Society of U.S. Army Flight Surgeons (SoUSAFS) The Society of US Army Flight Surgeons (SoUSAFS) serves to advance the science and art of Aerospace Medicine and its allie>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC