DOT Head Duffy Requests Meeting With Boeing’s Ortberg | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Feb 19, 2025

DOT Head Duffy Requests Meeting With Boeing’s Ortberg

Secretary Wants Report Of Company Status On Safety, Quality Issues

New U.S. Department of Transportation Secretary Sean Duffy has extended a request for Boeing President and CEO Kelly Ortberg to meet with him in Washington, D.C., for talks concerning the status of actions Boeing has taken to address safety and quality issues that have plagued the company the past several years.

Ortberg became Boeing’s CEO in August 2024 after a shakeup in management resulted in the departure of former CEO Dave Calhoun.

Duffy posted on X saying, “I've requested that the Boeing CEO come to D.C. as soon as possible to provide a full accounting of the steps the company is taking to address its quality and safety issues. Following that, I will visit Boeing myself to evaluate firsthand the measures being implemented to ensure its planes meet the highest safety standards.”

Boeing has been under fire following two high-profile accidents involving its 737 MAX aircraft that resulted in the deaths of nearly 350 people. Those crashes caused the FAA to ground the aircraft in March 2019, but ended in November 2020.

Then in January 2024, a door panel separated from an Alaska Airlines 737 MAX causing a rapid decompression and led to Alaska Airlines subsequently grounding its entire fleet of 737 Max aircraft.

The FAA conducted a safety and quality audit of Boeing that it said found “multiple instances where the companies allegedly failed to comply with manufacturing quality control requirements.”

The audit also identified non-compliance issues with manufacturing processes, parts handling and storage, and product control. These brought the FAA to impose limited production of the 737 MAX and increased oversight of the company.

Clearly, Duffy will ask Ortberg for a complete accounting of where Boeing stands regarding the steps it has taken to address the issues, and for his estimate of how long it will take the company to return to pre-2024 production without compromising quality or safety.

FMI:  www.boeing.com/

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC