Fire Scout UAV To Be Tested Ahead Of LCS Deployment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Feb 25, 2008

Fire Scout UAV To Be Tested Ahead Of LCS Deployment

Navy Will Conduct Operational Evaluation Later This Year

The US Navy has decided to integrate Northrop Grumman's MQ-8B Fire Scout Vertical Takeoff and Landing Tactical Unmanned Aerial Vehicle (VTUAV) onto another air-capable ship before it reaches the Littoral Combat Ship (LCS). The Fire Scout is still slated to go aboard the LCS, and the Navy remains committed to transitioning the Fire Scout in that direction.

The Fire Scout is a key component of the LCS, designed to support mission areas of anti-submarine warfare, surface warfare and mine warfare. Northrop says the modular nature of the LCS to accomplish the designated mission is perfectly complemented by the Fire Scout and its modular mission payload capability.

However, due to changes in the LCS development schedule, the Navy intends to conduct the Fire Scout Operational Evaluation (OpEval) aboard a ship that will be designated by the US Fleet Forces Command within the next 30 days. Officials say this will provide the fleet with unmanned aerial system support as soon as possible.

According to the current schedule, the Navy will conduct Technical Evaluation on the Fire Scout on the designated ship in the fall 2008 and OpEval in the summer 2009. The Fire Scout will reach Initial Operating Capability soon after OpEval in 2009. The Navy will continue to support LCS Initial Operational Test and Evaluation (IOT&E) efforts in fiscal year 2011.

"This is great news for the Navy and for the Fire Scout," said Doug Fronius, MQ-8B Fire Scout VTUAV program director for Northrop Grumman's Integrated System sector. "It's a win-win situation because the Fire Scout gets to progress through testing and initial operational capability. It will be ready to deploy on operational missions and will be ready when the LCS needs it."

Fire Scout VTUAV restructuring is in the best interests of the Fleet and the US Navy Fire Scout VTUAV program because it enables the Navy to continue supporting LCS integration and will provide a more mature system for LCS deployments.

FMI: www.northropgrumman.com, www.navy.mil

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC