First Drop: Lancer Drops JSOW In Tests At Edwards | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 08, 2003

First Drop: Lancer Drops JSOW In Tests At Edwards

A B-1B Lancer test crew at Edwards AFB recently dropped the Joint Standoff Weapon for the first time from the long-range bomber, according to the Air Force Flight Test Center.

The four-person global power bomber combined test force flight team from the 419th Flight Test Squadron released two standoff weapons as part of ongoing separation testing on the Lancer. The weapon is intended to provide a low-cost, highly lethal glide weapon with a standoff capability which allows aircrews to hit a target from a distance, reducing the risk from enemy defenses, officials said.

The JSOW family of air-to-surface glide weapons has a range of 12 nautical miles at low altitudes and as much as 63 nautical miles at high-altitudes, according to program office experts.

Ultimately, Tom said it is the operators in the field who will benefit from the new standoff weapons capability. It is slated to be used against a variety of land and sea targets and will operate from ranges outside enemy point defenses.

Test force experts are also evaluating the vibration and acoustic environment of the B-1B's bomb bays with the new weapons and with various weapons-bay door configurations, said Maj. Brian Tom, a weapon system officer on the mission. The team is also performing similar tests using the Joint Air-to-Surface Standoff Missile.

Testing on both weapons is also relying on the B-1B's new Block E1 avionics software for the first part of the test program, Tom said. The bomber team is evaluating the software as part of a separate, ongoing test program.

Previous testing on this new software allowed team members to successfully use it during the recent drop, he said. Tom serves as the project weapon system officer for both the E1 software test program and the integration tests. New integration software testing will begin in August, according to program officials.

"Maintenance is a huge part of our success," he said. "Our maintainers have kept us on track, and we haven't lost a single sortie since we started testing." [ANN Thanks Leigh Anne Bierstine, Air Force Flight Test Center Public Affairs]

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (11.29.25): Waypoint

Waypoint A predetermined geographical position used for route/instrument approach definition, progress reports, published VFR routes, visual reporting points or points for transiti>[...]

ANN's Daily Aero-Linx (11.29.25)

Aero Linx: Sentimental Journey to Cub Haven Sentimental Journey Flyin began in 1986 with a group of dedicated volunteers working to provide a sentimental return to Lock Haven, the >[...]

NTSB Prelim: Jabiru USA Sport Aircraft LLC J230-SP

The Pilot Would Often Fly Over Their House At A Low Altitude And That Family Members Would Go Outside To Wave On November 14, 2025, at 1708 eastern standard time, a Jabiru USA Spor>[...]

Classic Aero-TV: Crafting The Future of eVTOL Infrastructure

From 2024 (YouTube Edition): Volatus Infrastructure Paves The Way The name “Volatus” seems to be everywhere these days, popping up in a series of partnerships and proje>[...]

Klyde Morris (11.28.25)

Fortnite Conquers All, Klyde FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC