White House Aero-Hit-List #8: Presidential Helicopter (VH-71) | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, May 08, 2009

White House Aero-Hit-List #8: Presidential Helicopter (VH-71)

$17 Billion Cut... But Trillions More Spent Elsewhere

The Obama Administration, in the process of spending trillions of dollars for all manner of programs and projects, is trumpeted the 17 Billion dollars it is trying to cut from the Federal Budget. Rather than try to digest them all en masse, we'll look at each of them one at a time and allow you to make up YOUR mind as to the rationale and wisdom for the decisions included below. Herewith; another of the programs on the chopping block that has an aviation or aerospace connotation.

From the 'Terminations, Reductions, and Savings' document published this week by the OMB, as part of the FY 2010 US Budget:

Proposal: The Administration proposes to terminate the Presidential Helicopter replacement (VH-71) program and to initiate a new Presidential Helicopter replacement program, and to properly develop options for a fiscal year 2011 follow-on program. The Presidential Helicopter is responsible for the safe, reliable transport of the President in administrative and contingency environments, worldwide. The VH-71 is being developed to replace the existing VH-3D and VH-60N helicopters, which currently serve as "Marine One".

Justification: The VH-71 program is six years behind schedule, and its cost has grown from $6.5 billion to over $13 billion. Over $3.2 billion has already been spent on this program with no operational aircraft delivered. The Government Accountability Office has warned that future costs of the VH-71 are unknown, and the Congressional Research Service has raised the question if the current program should be cancelled. These high costs and schedule slippage have occurred because of challenging program requirements and an ambitious schedule. Instead of continuing to pursue the current program, the Administration proposes to cancel it, review requirements, and establish a new program. A new Presidential Helicopter replacement program will allow the Administration to take advantage of new technologies and develop a helicopter that is fiscally responsible while still meeting the President's requirements.

Funding in 2010 will cover termination costs, Government efforts to develop options for a Presidential Helicopter replacement program, and service life extensions for the current Presidential Helicopter fleet.

FMI: www.whitehouse.gov/omb/budget/fy2010/assets/trs.pdf

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC