This Time, For Sure, Probably | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 01, 2003

This Time, For Sure, Probably

7E7 "Dreamliner" Will Likely Get Built: Condit

It's not the way to predict things, by saying that after a row of false starts, Boeing's ready to actually start work on a new airplane; but that's the message Boeing's chair, Phil Condit, gave reporters in London last week.

He said that, "By the law of averages, we must be at the right place," after the start-stop programs that included the 747X, the Sonic Cruiser, and the 747-800. Add to those notable flops the stillborn 767-400ER and a couple other 747 ideas, and anyone would conclude that, this time, Boeing's marketing mavens would have it right; except that they have had it wrong, so consistently, lately.

That's not to say that Airbus has been hitting nothing but home runs, either: the A3XX (A380) is a very risky program, particularly so as it was launched before the terrorist attacks; and the A400M military heavy-lifter program is not much more than a joke, except to the governments that got a piece of the "action," and will have to pay so dearly for their "jobs programs."

Overcapacity in the big-airliner industry will be a factor for a long time; and that systemic problem will not go away until the flying public stops minding being hassled at every turn, and until some failed airlines are permitted by their sponsor-governments to actually fold up.

 Condit, in making the remarks, certainly knows that, by the time the new "Dreamliner" gets into the air, a lot of that overcapacity, at least in older airframes, will be back at the recyclers. If the 7E7 delivers, as predicted, 20% or more efficiency, its viability, by 2008, should be a no-brainer.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC