This Time, For Sure, Probably | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 01, 2003

This Time, For Sure, Probably

7E7 "Dreamliner" Will Likely Get Built: Condit

It's not the way to predict things, by saying that after a row of false starts, Boeing's ready to actually start work on a new airplane; but that's the message Boeing's chair, Phil Condit, gave reporters in London last week.

He said that, "By the law of averages, we must be at the right place," after the start-stop programs that included the 747X, the Sonic Cruiser, and the 747-800. Add to those notable flops the stillborn 767-400ER and a couple other 747 ideas, and anyone would conclude that, this time, Boeing's marketing mavens would have it right; except that they have had it wrong, so consistently, lately.

That's not to say that Airbus has been hitting nothing but home runs, either: the A3XX (A380) is a very risky program, particularly so as it was launched before the terrorist attacks; and the A400M military heavy-lifter program is not much more than a joke, except to the governments that got a piece of the "action," and will have to pay so dearly for their "jobs programs."

Overcapacity in the big-airliner industry will be a factor for a long time; and that systemic problem will not go away until the flying public stops minding being hassled at every turn, and until some failed airlines are permitted by their sponsor-governments to actually fold up.

 Condit, in making the remarks, certainly knows that, by the time the new "Dreamliner" gets into the air, a lot of that overcapacity, at least in older airframes, will be back at the recyclers. If the 7E7 delivers, as predicted, 20% or more efficiency, its viability, by 2008, should be a no-brainer.

FMI: www.boeing.com

Advertisement

More News

NTSB Prelim: Sikorsky UH60 Sikorsky UH-60

Sikorsky UH-60 Black Hawk Helicopter Collided With An Unregistered DJI Mavic 3T Unmanned Aerial Vehicle On July 7, 2025, about 1557 central daylight time, an unregistered Sikorsky >[...]

Aero-News: Quote of the Day (11.13.25)

“After considering the measures taken, minimum liquidity covenants in the Company's current debt obligations and cash flows to maintain current operational obligations requir>[...]

ANN's Daily Aero-Term (11.13.25): Ground Clutter

Ground Clutter A pattern produced on the radar scope by ground returns which may degrade other radar returns in the affected area. The effect of ground clutter is minimized by the >[...]

ANN's Daily Aero-Linx (11.13.25)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC