This Time, For Sure, Probably | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.02.24

Airborne-NextGen-12.03.24

Airborne-Unlimited-12.04.24

Airborne Flt Training-12.05.24

Airborne Holiday

Tue, Jul 01, 2003

This Time, For Sure, Probably

7E7 "Dreamliner" Will Likely Get Built: Condit

It's not the way to predict things, by saying that after a row of false starts, Boeing's ready to actually start work on a new airplane; but that's the message Boeing's chair, Phil Condit, gave reporters in London last week.

He said that, "By the law of averages, we must be at the right place," after the start-stop programs that included the 747X, the Sonic Cruiser, and the 747-800. Add to those notable flops the stillborn 767-400ER and a couple other 747 ideas, and anyone would conclude that, this time, Boeing's marketing mavens would have it right; except that they have had it wrong, so consistently, lately.

That's not to say that Airbus has been hitting nothing but home runs, either: the A3XX (A380) is a very risky program, particularly so as it was launched before the terrorist attacks; and the A400M military heavy-lifter program is not much more than a joke, except to the governments that got a piece of the "action," and will have to pay so dearly for their "jobs programs."

Overcapacity in the big-airliner industry will be a factor for a long time; and that systemic problem will not go away until the flying public stops minding being hassled at every turn, and until some failed airlines are permitted by their sponsor-governments to actually fold up.

 Condit, in making the remarks, certainly knows that, by the time the new "Dreamliner" gets into the air, a lot of that overcapacity, at least in older airframes, will be back at the recyclers. If the 7E7 delivers, as predicted, 20% or more efficiency, its viability, by 2008, should be a no-brainer.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (12.03.24): Area Navigation (RNAV)

Area Navigation (RNAV) A method of navigation which permits aircraft operation on any desired flight path within the coverage of ground− or space−based navigation aids >[...]

ANN's Daily Aero-Linx (12.03.24)

Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]

Aero-News: Quote of the Day (12.04.24)

“We learned a great deal in the process, such as greater coding skills, soldering techniques, and video editing skills...” Source: Cuyahoga County Team Captain John Ana>[...]

Airborne 12.04.24: 1st Flt-Integral E!, GAMA 3Q24 Stats, Heart Gears Up

Also: Swift Hits 56000', 100 Midnight Order, $1.4B For ATC, USCG/USAF Rescue Op INTEGRAL E, the all-electric version of Aura Aero’s two-seat aircraft, made its maiden flight >[...]

Airborne Affordable Flyers 11.26.24: BushCat's Back!, LODA Update, DRL Miami

Also: Van Celebrates 85th, Trio Pro Pilot Autopilot, Joby on MSFS24, Sonex Transition The BushCat was manufactured in South Africa by SkyReach beginning in 2014, selling its first >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC