Boeing Introduces New Method For Building 777 Fuselages | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Jul 21, 2014

Boeing Introduces New Method For Building 777 Fuselages

Fuselage Automated Upright Build Expected To Yield Safety, Quality Benefits

Boeing is in the final phases of testing and production readiness of a new method for building 777 fuselages as part of its ongoing technology investment strategy, the company says.

Known as the Fuselage Automated Upright Build, or FAUB, this Advanced Manufacturing technology improves workplace safety and increases product quality. This technology has been in development by Boeing since 2012.

With this new technology, fuselage sections will be built using automated, guided robots that will fasten the panels of the fuselage together, drilling and filling the more than approximately 60,000 fasteners that are today installed by hand.

FAUB offers numerous benefits including an improvement in employee safety. The nature of the drilling and filling work makes it ideal for an automated solution. More than half of all injuries on the 777 program have occurred during the phase of production that is being automated. In addition, the automated system is expected to reduce build times and improve first-time quality of the build process.

"This is the first time such technology will be used by Boeing to manufacture widebody commercial airplanes and the 777 program is leading the way," said Elizabeth Lund, vice president and general manager, 777 program and Everett site, Boeing Commercial Airplanes. "We're excited to continue improving the production process here and we're positioning ourselves to begin building 777X airplanes in the future."

The 777 program has already begun testing FAUB at a facility in Anacortes, WA Production readiness preparations are underway and the system will be installed in Everett in a new portion of the main factory that is under construction now. The technology is expected to be implemented in the next few years.

The robotic system, designed for Boeing by KUKA Systems, is the latest in a series of strategic Advanced Manufacturing moves on the 777 program, which have already included new systems for painting wings and other drilling operations.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC