Hartsfield-Jackson International Airport To Install New Generators | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Tue, May 22, 2018

Hartsfield-Jackson International Airport To Install New Generators

Responds To Power Failure At The Major Hub Last December

Hartsfield-Jackson International Airport in Atlanta will spend $130 million to install about 20 generators at the airport in response to a power failure that shut down the airport last December.

The Atlanta Journal-Constitution reports that the generators will be paid for by short-term financing that will eventually be paid back using airline rent payments.

Hartsfield-Jackson general manager Roosevelt Council said that the changes are planned to assure that there is 100 percent redundancy and "ensure that we would be able to identify where the problem is and respond a lot quicker."

The installation is expected to take about 30 months to get approvals, let contracts and complete the installation.

The December outage was caused by a fire in the airport's underground power supply, and left some 35,000 travelers in the dark, according to the report. The generators will produce 65 megawatts of power. At least two generators will be installed on each concourse designed to operate up to 48 hours. They could be refueled while running, according to airport officials.

Council said that solar generators would not be able to produce enough power unless a "humongous" solar farm was installed, and there is not enough available land at the airport for such an installation.

(Image from file)

FMI: Original report

Advertisement

More News

NTSB Prelim: Lee Aviation LLC JA30 SuperStol

A Puff Of Smoke Came Out From The Top Of The Engine Cowling Followed By A Total Loss Of Engine Power On May 9, 2025, about 1020 mountain daylight time, an experimental amateur-buil>[...]

Classic Aero-TV: Curtiss Jenny Build Wows AirVenture Crowds

From 2022 (YouTube Edition): Jenny, I’ve Got Your Number... Among the magnificent antique aircraft on display at EAA’s AirVenture 2022 was a 1918 Curtiss Jenny painstak>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Classic Aero-TV: Quest Kodiak Enhances Migration Monitoring Programs

From 2008 (YouTube Edition): US Fish and Wildlife Service Chooses The Kodiak To Monitor Waterfowl Populations Waterfowl all over North America may soon have to get used to a new ab>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC