Friday Shuttle Launch Is 'Go' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Thu, May 13, 2010

Friday Shuttle Launch Is 'Go'

NASA Flight Directors Give The Green Light To Final Scheduled Atlantis Flight

Wednesday was "L-2" at NASA's Kennedy Space Center in Florida, as the shuttle and crew prepare for STS-132. Countdown clocks across the launch complex were activated at 1600 EDT Tuesday and the countdown continues on schedule for liftoff Friday at 1420.

During the 12-day mission, Atlantis and the mission's six astronauts are delivering an Integrated Cargo Carrier and a Russian-built Mini Research Module to the International Space Station.

"From a Space Shuttle Program and ISS Program standpoint, we're ready to launch Atlantis and get this mission under way," said Mike Moses, chair of the prelaunch mission management team that gathered today at Kennedy and gave a unanimous "go" for liftoff. According to Launch Director Mike Leinbach, the launch team is not tracking any issues that would prevent an on-time liftoff.

Atlantis' astronauts are relaxing today while technicians at Launch Pad 39A load the orbiter's power reactant and storage distribution system, which supplies super-cold propellants to the vehicle's three fuel cells and life-support system during flight.

A high-pressure system continues to dominate Florida's weather pattern, resulting in favorable weather for the rest of the week. The primary launch weather concern is a low cloud ceiling, but the forecast is good overall, calling for a 70 percent chance of favorable conditions at launch time.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (06.02.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

ANN's Daily Aero-Linx (06.02.25)

Aero Linx: Airpower Museum The APM owns 30 acres on Antique Airfield, including the south half of the N-S runway. It consists of three hangars, an annex, and a library. The museum >[...]

NTSB Prelim: Champion 7ECA

Patient Told The First Responders That The “Man Who Was In The Plane Was Flying At The Time Of The Accident And Had Overshot The Runway They Were Attempting To Land On.&rdquo>[...]

Classic Klyde Morris (From 06.10.22)

Klyde Just Can't Believe This Has Gotten To This Point... FMI: www.klydemorris.com>[...]

Airborne 05.30.25: Anti-Helicopter Bill, PW Strike Done, All-Electric Bristell

Also: Duffy Wants $$$, KS Airports, Morningside U’s Aviation School, New Airstrip In ID After 6 were killed in a helicopter crash over the Hudson River, several US Representa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC