Software Issue Could Put Brakes On 787 Cert Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.17.24

Airborne-NextGen-06.18.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Thu, Jul 17, 2008

Software Issue Could Put Brakes On 787 Cert Schedule

A New Problem For The Dreamliner

Alas, there's a new snag to report involving Boeing's struggle to bring its 787 Dreamliner to production.

During his update Tuesday on the troubled program's progress at the Farnborough International Airshow, 787 program chief Pat Shanahan admitted there's an "air bubble" in the software that controls the airliner's braking system.

Boeing says the problem lies in the control software used in the plane's brake monitoring system. GE Aviation Systems subcontracted the work to Hydro-Aire, part of Crane Aerospace and Electrics. Crane must go back and rewrite parts of the brake control code to comply with certification standards.

"We need to push harder on the brake system" in order to achieve Boeing's certification targets, Shanahan told Reuters. "It's not that the brakes don't work, it's the traceability of the software.

"I'm confident it will be done. It's General Electric," he added. Crane couldn't be reached for comment by Reuters.

As ANN reported Wednesday, Boeing says the first 787 remains on track for its first flight later this year... and Boeing still maintains the first customer aircraft will be delivered, certified, in the third quarter of 2009.

"Airplane One is in really good shape," said Shanahan.

But the software issue -- and other continuing glitches, including problems with the center fuselage assembly process, and a damaged body section for Dreamliner #4 -- could pose problems for the certification schedule down the line.

Shanahan admits those fixes are eating into the safety buffer Boeing added into its revised schedule, announced in April. "I'm eating margin I don't want to eat," he said.

FMI: www.boeing.com, www.craneae.com

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC