AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Tue, Apr 03, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-06-04

PRODUCT: Certain Airbus Model A320-111, -211, -212, and -231 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2004-03-07, which applied to the aircraft listed above AD 2004-03-07 required repetitive inspections for fatigue cracking around the fasteners attaching the pressure panel to the flexible bracket at a certain frame (FR), adjacent to the longitudinal beams on the left and right sides of the airplane; and repair as necessary.

This new AD retains certain requirements of AD 2004-03-07, expands the applicability, and requires an inspection of the fastener holes on the pressure panel and modification or repair as applicable.

This AD was prompted by fatigue tests which revealed cracking around the fasteners attaching the pressure panel to the flexible bracket, and by the discovery of additional cracks under the longitudinal beams at locations that are not included in the inspection area required by AD 2004-03-07.

DATES: This AD is effective May 3, 2018.

COST: The FAA estimates that this AD affects 737 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspection [Retained from AD 2004-03-07]: Up to 2 work-hours × $85 per hour = $170 per inspection cycle.
  • Inspection [new proposed requirement]: 13 work-hours × $85 per hour = $1,105.
  • Modification (if necessary): Up to 213 work-hours × $85 per hour = $18,105 Parts are estimated to cost up to $8,510, for a total cost per airplane at up to $26,615.
FMI: AD

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC