Modifications To C-17 MTS Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Mar 17, 2017

Modifications To C-17 MTS Completed

TRU Simulation + Training Finishes Contracts With USAF, RAAF

TRU Simulation + Training recently completed modifications to the United States Air Force’s (USAF) C-17 Maintenance Training System (MTS) as well as a Maintenance Training Device (MTD) for the Royal Australian Air Force (RAAF). The modifications, a combined award value of over $30 million, were completed under a contract with the C-17 Training System (TS) prime contractor, L-3 Link Simulation and Training. The C-17 MTS is the USAF Air Mobility Command’s large complex training system with 11 device types. The USAF has a total of 37 devices installed at eight locations. TRU (formerly AAI) has performed as the maintenance device provider for the C-17 training system since 1997.

The modifications included aircraft concurrency revisions to the Block 17+ configuration, as well as adding new task capabilities for Electronic Warfare and Flares training. TRU’s completion of these major modifications brings the MTS up to the latest aircraft configuration required for current and effective maintenance training and provides greatly enhanced training capabilities for the USAF and RAAF’s C-17 maintainers.

TRU’s Military and Business Simulation business unit contains the component of AAI Corporation that has been maintaining, modifying, and producing C-17 MTDs for the USAF since 1997. That component was merged into TRU when the company was formed in 2014.

“With extensive experience on Air Force maintenance training requirements for both the USAF and RAAF, TRU was able to deliver highly complex modifications to the C-17 MTDs ahead of schedule, which is keeping the customers’ teams mission ready,” said John Hayward, Senior Vice President and General Manager of TRU’s Military and Business Simulation division.

(Source: Textron news release. Image from file)

FMI: www.textron.com

 


Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC